Laserfiche WebLink
Bey az&,Patel <br />Subhash Patel, PE, SE <br />Structural Engineer <br />Education Mr. Patel has over 35+years of experience providing structural engineering services for <br />on water and wastewater infrastructure. He has worked on water storage projects <br />M.S., Structural throughout California, including, prestressed concrete tanks and reservoirs, pump <br />Engineering, University stations, drainage, piping and appurtenances. He has substantial experience managing <br />of California, Berkeley, all project phases— predesign, design, bid, and construction. As the project manager, <br />1972 Subhash is responsible for our entire project team. He will coordinate and <br />B.E., Civil Engineering, communicate with the City's project manager; schedule, budget; allocate resources, <br />University of Baroda, assess, analyze, provide input, constructability, and biddability review; manage <br />India, 1970 construction support services; and assure all deliverables receive a thorough quality <br />control review. <br />Registrations Professional Record <br />Structural Engineer, 1.0 to 5.0 MG Reservoir Repairs Phase 3, City of Oceanside, California. Managing <br />California, No. 54233 structural engineer for condition assessment, seismic evaluation, and rehabilitation of <br />Civil Engineer, nine prestressed concrete reservoirs and one steel reservoir ranging in size from 1.5 <br />California, No. C53540 MG to 5.0 MG. The work in Phase 3 included site investigations, condition assessment, <br />and seismic evaluations. The reservoirs are above -ground and partially buried <br />Professional Engineer <br />reservoirs. The prestressed concrete reservoirs show evidence of coating deterioration, <br />(Civil, Structural), <br />shotcrete cover spalling, prestressed wire corrosion, and surface cracks. <br />Washington, No.49115 <br />Sand Hill Reservoir No. 2 Roof Replacement, City of Menlo Park, Menlo Park, <br />Affiliations <br />California. Technical Advisor/QA providing roof -replacement design and engineering <br />guidance for a reservoir roof that was at the end of its useful life. It had started sagging <br />Structural Engineers <br />and water was ponding on the flat roof of the trapezoidal reservoir. Structural <br />Association of San <br />connections and joist were coming loose and water was penetrating through the roof <br />Diego <br />causing the wood to rot. Dr. Wu provided seismic evaluation and analysis services, <br />American Society of <br />identified design alternatives, and assisted in the preparation of the final design for the <br />Civil Engineers <br />new roof construction including installation of new mixers in Sand Hill Reservoir Nos. 1 <br />and 2. <br />1.0 MG Forebay Tank, County of Los Angeles Department of Water and Power, <br />Kern County, California. Managing structural engineer for design of the partially <br />buried forebay tank, a 110-foot diameter, 22-foot tall circular prestressed concrete tank <br />with an operating capacity of 1.0 MG. The tank includes a sump at the bottom to <br />reduce the minimum water depth in the tank to maintain submergence over the pump <br />intake. <br />5.3 MG "E" Reservoir, Vista Irrigation District, Vista, California. Managing structural <br />engineer for design of a new 5.3 MG partially buried circular prestressed concrete <br />reservoir, control valve and pressure reducing station vault. Work included review of <br />the geotechnical report prepared by the geotechnical consultant; preparation of <br />detailed structural drawings and details; determination of the structural elements of <br />the reservoir outlet sump; preparation of the structural calculations for the project; <br />review of the accuracy of the technical specifications provided by the client; and <br />preparation of30%, 90%, and 100%design drawings. During construction, on an as <br />needed basis, reviewed structural submittals, and provided technical support and on - <br />site construction observation services. <br />25B-38 <br />