Laserfiche WebLink
Carlos Amante, PE, GE <br />Principal Engineer / Project Manager <br />Mr. Amante has over 25 years of broad geotechnical and <br />earthquake engineering consulting experience where he has <br />consistently demonstrated a wide-ranging breadth of <br />knowledge and ability to develop innovative and cost- <br />effective engineering solutions to numerous private and <br />public sector clients. He has vast experience working on <br />water/wastewater, transportation, energy, industrial, <br />commercial and residential projects. Mr. Amante is highly <br />experienced in project management and technical delivery <br />of projects involving complex ground investigation, seismic - <br />resilient design of earthworks and foundations, slope <br />engineering, liquefaction assessment, construction quality <br />assurance and material testing, and constructability/value <br />engineering study. <br />Relevant Experience <br />®Gmene ConwllaMb <br />EDUCATION <br />MS, Geotechnical Engineering, <br />University of British Columbia, <br />Canada, 1993 <br />MEng, Master of Engineering, <br />Earthquake Engineering, Kanazawa <br />University, 1991 <br />BS, Civil Engineering, University of <br />the Philippines, Metro Manila, <br />Philippines, 1984 <br />REGISTRATIONS/CERTIFICATION S <br />California, Geotechnical Engineer <br />No. GE2724 <br />California, Professional Engineer in <br />Civil Engineering No. C57831 <br />Two 8.0-MG Steel Water Storage Tanks, Westminster, CA. Geotechnical Project Engineer. <br />Geotechnical investigation and site -specific seismic hazard analysis for two 190-ft diameter, <br />40-ft high steel water storage tanks, built side -by -side on a 4-acre site. Recommended site <br />remediation consisting of soil surcharge program and installation of stone columns to mitigate <br />weak upper clay soils and loose liquefiable sands underneath the site. <br />6.0-MG Highland Avenue Reservoir Replacement, Yorba Linda, CA. Geotechnical Project <br />Manager. Geotechnical investigation and value engineering study of proposed permanent <br />concrete water reservoir and two temporary steel water tanks to replace the existing buried <br />hopper reservoir. <br />1.0-MG Arbor Ridge Steel Water Tank, Walnut, CA. Geotechnical Project Manager. <br />Geotechnical investigation for a new welded -steel water tank located in the San Jose Hills. <br />3.0-MG Rawlings Reservoir Replacement, Cityof Tustin, CA. Geotechnical Project Manager. <br />Geotechnical investigation for the proposed replacement of existing 4.2-MG hopper -type water <br />reservoir with two cylindrical concrete water -tanks. <br />10.8-MG Water Storage Facility, Santa Clarita, CA. Geotechnical Project Manager. <br />Geotechnical reconnaissance review for the proposed emergency and operational water <br />storage facility, including a water reservoir along with supporting appurtenances that may <br />include pipelines, pressure regulators, valves and pump stations. <br />Apple Valley Water System Improvements, Apple Valley, San Bernardino County, CA. Lead <br />Geotechnical Engineer. Geotechnical investigation for proposed water system improvements, <br />including two 28-ft diameter, 16-ft high steel -bolted potable water tanks to replace the three <br />existing water tanks at the Mesa Vista tank site, 6-inch diameter, 4,800-ft long transmission <br />pipeline, and 8-inch diameter, 1,300-ft long distribution lines. <br />25B-50 <br />