My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55E - RESO SB1 FUNDING FY 2020-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/07/2020
>
55E - RESO SB1 FUNDING FY 2020-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 9:34:20 AM
Creation date
4/2/2020 9:00:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55E
Date
4/7/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution — FY 2020-21 SB-1 RMRA Project List <br />April 7, 2020 <br />Page 2 <br />17th Street Rehabilitation: Bristol to Flower <br />Reconstruction/resurfacing of existing pavement and replacement/installation of missing or <br />damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />17th Street Rehabilitation: Fairview to Bristol <br />Application of slurry seal, crack seal, and minor pavement resurfacing with asphalt concrete. The <br />work also include replacement/installation of missing or damaged curbs, gutters, sidewalk, <br />driveway approaches, wheelchair ramps, and striping. <br />Alton Avenue Rehabilitation: Main to Standard <br />Reconstruction/resurfacing of existing pavement and replacement/installation of missing or <br />damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />Fairview Avenue Rehabilitation: City Limits to Segerstrom <br />Reconstruction/resurfacing of existing pavement and replacement/installation of missing or <br />damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />Flower Street Rehabilitation: McFadden to First St <br />Reconstruction/resurfacing of existing pavement and replacement/installation of missing or <br />damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />MacArthur Boulevard Rehabilitation: Fairview to Raitt <br />Reconstruction/resurfacing of existing pavement and replacement/installation of missing or <br />damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />The City must annually submit the proposed RMRA projects list to the CTC, and as required, <br />provide updates on the project progress. Therefore, staff recommends that the City Council adopt <br />a resolution recognizing the proposed project list which will utilize FY 2020-21 RMRA funds (Exhibit <br />1). <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities & <br />Infrastructure, Objective #1 (Establish and Maintain a Community Investment Plan for All City <br />Assets), Strategy G (Develop and Implement the City's Capital Improvement Program in <br />Coordination with the Community Investment and Deferred Maintenance Plans). <br />ENVIRONMENTAL IMPACT <br />There is no environmental impact associated with this action <br />55E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.