Carlos Amante, PE, GE
<br />Principal Engineer / Project Manager
<br />Mr. Amante has over 25 years of broad geotechnical and
<br />earthquake engineering consulting experience where he has
<br />consistently demonstrated a wide-ranging breadth of
<br />knowledge and ability to develop innovative and cost-
<br />effective engineering solutions to numerous private and
<br />public sector clients. He has vast experience working on
<br />water/wastewater, transportation, energy, industrial,
<br />commercial and residential projects. Mr. Amante is highly
<br />experienced in project management and technical delivery
<br />of projects involving complex ground investigation, seismic -
<br />resilient design of earthworks and foundations, slope
<br />engineering, liquefaction assessment, construction quality
<br />assurance and material testing, and constructability/value
<br />engineering study.
<br />Relevant Experience
<br />®Gmene ConwllaMb
<br />EDUCATION
<br />MS, Geotechnical Engineering,
<br />University of British Columbia,
<br />Canada, 1993
<br />MEng, Master of Engineering,
<br />Earthquake Engineering, Kanazawa
<br />University, 1991
<br />BS, Civil Engineering, University of
<br />the Philippines, Metro Manila,
<br />Philippines, 1984
<br />REGISTRATIONS/CERTIFICATION S
<br />California, Geotechnical Engineer
<br />No. GE2724
<br />California, Professional Engineer in
<br />Civil Engineering No. C57831
<br />Two 8.0-MG Steel Water Storage Tanks, Westminster, CA. Geotechnical Project Engineer.
<br />Geotechnical investigation and site -specific seismic hazard analysis for two 190-ft diameter,
<br />40-ft high steel water storage tanks, built side -by -side on a 4-acre site. Recommended site
<br />remediation consisting of soil surcharge program and installation of stone columns to mitigate
<br />weak upper clay soils and loose liquefiable sands underneath the site.
<br />6.0-MG Highland Avenue Reservoir Replacement, Yorba Linda, CA. Geotechnical Project
<br />Manager. Geotechnical investigation and value engineering study of proposed permanent
<br />concrete water reservoir and two temporary steel water tanks to replace the existing buried
<br />hopper reservoir.
<br />1.0-MG Arbor Ridge Steel Water Tank, Walnut, CA. Geotechnical Project Manager.
<br />Geotechnical investigation for a new welded -steel water tank located in the San Jose Hills.
<br />3.0-MG Rawlings Reservoir Replacement, Cityof Tustin, CA. Geotechnical Project Manager.
<br />Geotechnical investigation for the proposed replacement of existing 4.2-MG hopper -type water
<br />reservoir with two cylindrical concrete water -tanks.
<br />10.8-MG Water Storage Facility, Santa Clarita, CA. Geotechnical Project Manager.
<br />Geotechnical reconnaissance review for the proposed emergency and operational water
<br />storage facility, including a water reservoir along with supporting appurtenances that may
<br />include pipelines, pressure regulators, valves and pump stations.
<br />Apple Valley Water System Improvements, Apple Valley, San Bernardino County, CA. Lead
<br />Geotechnical Engineer. Geotechnical investigation for proposed water system improvements,
<br />including two 28-ft diameter, 16-ft high steel -bolted potable water tanks to replace the three
<br />existing water tanks at the Mesa Vista tank site, 6-inch diameter, 4,800-ft long transmission
<br />pipeline, and 8-inch diameter, 1,300-ft long distribution lines.
<br />25B-50
<br />
|