5®q iomene ConwllaMb
<br />Hashmi Quazi, PhD, PE, GE - Principal-in-Charge/QA/QC
<br />Dr. Quazi has over 31 years of experience providing
<br />geotechnical engineering services and has earned a EDUCATION
<br />reputation for providing quality work in an honest and ethical • PhD, Civil Engineering, University
<br />manner, on time and within budget. Dr. Quazi provides quality of Arizona, 1987
<br />control, budget oversight, and technical assistance on various ' MS, Civil Engineering, Arizona
<br />State University, 1982
<br />types of projects, including pipelines, water treatment plants, BS, Bangladesh Engineering
<br />wells, pump stations, water basins and other related projects. University, 1978
<br />Relevant Experience REGISTRATIONSICERTIFICATIONS
<br />6651
<br />Orange Count Water District North Basin Groundwater California, Civil Engineer, Engineer,
<br />g y E
<br />California, Geotechnical Engineer,
<br />Protection Pipeline, Fullerton and Anaheim, CA. Principal in #2517
<br />Charge. Provided resource and budget oversight, technical
<br />review and contract management for the geotechnical observation, materials testing and
<br />inspection. The project consisted of the construction of 27,713 linear feet of PVC pipeline, jack
<br />and bore operations for steel casing of varying sizes at three separate locations and installation
<br />of fiber optic well communications for two 4-inch PVC fiber optic conduits within pipeline trench
<br />and pull boxes.
<br />Orange County Water District Groundwater Replenishment System, Fountain Valley, CA.
<br />Principal in Charge. Provided resource and budget oversight, technical review and contract
<br />management for the geotechnical observation, materials testing and inspection. The project
<br />consisted of modifying the OCWD Groundwater Replenishment System from 70 MGD to 100
<br />MGD. The project involved the Advanced Water Treatment Facility (AWPF) expansion, and the
<br />Secondary Effluent Flow Equalization project. The expansion required the construction of
<br />several new structures, including two 7.5 MG above -ground steel storage tanks, 1,000 linear
<br />feet of 54-inch diameter pipeline, 200 linear feet of 54-inch diameter pipeline, a UV facility for
<br />installation of two new UV trains, a decarbonation tower, a lime saturator, and other
<br />modifications and upgrades.
<br />Orange County Sanitation District P1-37 Primary Clarifiers 16-31 & Related Facilities,
<br />Fountain Valley, CA. Principal in Charge. Provided resource and budget oversight, technical
<br />review and contract management for the geotechnical observation, materials testing and
<br />inspection. The project included the construction of 16 new primary clarifiers with support
<br />equipment, improvements to existing primary clarifier 6-15 and improvements to primary
<br />clarifiers 1-5.
<br />Orange County Sanitation District P1-100 Sludge Digester Rehabilitation, Fountain Valley,
<br />CA. Principal in Charge. Provided resource and budget oversight, technical review and contract
<br />management for the geotechnical observation, materials testing and inspection. The project
<br />involved the rehabilitation of 12 digesters at the OCSD Plant 1. The project was intended to
<br />repair and replace aging equipment, such as pumps, sludge grinders, heat exchangers, and
<br />piping, thus making the facilities more efficient for increased solid waste handling. It also
<br />includes 1,500 s.f. expansion of the Power Building No. 5.
<br />25B-52