My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-04-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/07/2020
>
FULL PACKET_2020-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2020 9:41:11 AM
Creation date
4/2/2020 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/7/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHY CHOOSE BRADY? <br />• BRADY's Proposed Project Manager, Richard Brady, P.E., BCEE, is one of the <br />most experienced reservoir rehabilitation design experts in the United States <br />with more than 150 million gallons of water storage tank experience in Southern <br />California alone. <br />• Richard Brady began his career at James M. Montgomery (JMM) Consulting <br />Engineers in 1980. Mr. Brady is intimately aware of JMM concrete reservoir <br />designs, (Crooke, Cambridge, South, and Walnut Reservoirs) <br />• BRADY Vice President Max Dykmans, P.E., S.E., is the former Owner of DYK <br />Incorporated (now called DN Tanks) and has been involved in thousands of <br />individual prestressed concrete reservoirs during his decades at DYK, (John <br />Garthe Reservoirs) <br />• BRADY's Corporate resume exceeds 500 million gallons of reservoir projects in <br />individual sizes from 250,000 gallons to 52 million gallons. <br />• BRADY's concrete reservoir rehabilitation experience includes all types: <br />conventionally reinforced concrete and prestressed concrete, and all shapes: <br />circular, rectangular, square, and custom shapes. <br />• Lee Biggers, P.E., S.E., is a BRADY Vice President and leads our Structural <br />Engineering Group. Lee has more than 45 years of experience in concrete <br />reservoir rehabilitation up to 21.5 MG. <br />• BRADY's lower overhead structure will deliver cost competitive engineering <br />services, with unmatched quality and experience. <br />(Alvarado WTP - 2 x 21 MG & 1 x 35 MG Prestressed Concrete Reservoirs) <br />091 lm��Js <br />` RICHARD BRADY &ASSOCIATES, INC. <br />25B-76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.