My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-04-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/07/2020
>
FULL PACKET_2020-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2020 9:41:11 AM
Creation date
4/2/2020 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/7/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
execution of the work with all appropriate levels of review to ensure that the project's delivery <br />meets the standards and expectations of the City. <br />All of the City's reservoirs to be studied under this contract have lived long lives and have served <br />the City well for many decades. The City's reservoirs were once state of the art and very commonly <br />used throughout the Southern California region. Each of these design solutions lasted well into <br />the 1990's and early 2000's for small to medium sized tanks, surviving many earthquakes. For <br />example, the 20 MG Alvarado Regulating reservoir design of 1946 and the 35 MG Earl Thomas <br />reservoir design of 1955, both located at the City of San Diego's Alvarado Water Treatment Plant, <br />were "state of the art" for their era, but could not stand the test of time. Given their extreme <br />poor condition, there was no alternative to demolition and replacement. The demolition and <br />replacement of these two large reservoirs were designed by our Project Manager, Richard Brady, <br />P.E., BCEE. We have successfully met this challenge before in an award -winning way. We were <br />able to squeeze 42 MG of new storage in the existing 20 MG footprint by raising the HGL by 1 <br />1. Alvarado WTP, 1950s, 20 MG and 35 MG Reservoirs <br />2. 20 MG Regulating Reservoir, 1992, roof in distress <br />3. Demolition, sloped walls, gunite removed <br />4. Subgrade forthetwo new 21 MG Reservoirs <br />5. Floor slab underway, shoring in place <br />6. West Reservoir accelerated construction <br />7. 75%complete, West Reservoir (right side of photo) <br />S. 90%complete, West Reservoir (right side of photo) <br />9. West Reservoir placed into service (right side of photo) <br />10. Project completed, APWA 1995 National Project of the Year for the United States (all projects), $25M or less <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.