Laserfiche WebLink
BRAY Richard Brady, PE, BCEE <br />Principal -in -Charge & Project Manager <br />improvements, and the expansion of the existing Control Building. <br />Washington Aqueduct's 240 mgd Dalecarlia and 120 mgd McMillan Water Treatment Plants <br />Client: U.S. Army Corps of Engineers, Baltimore District <br />Title: Project Manager <br />Prepared the Comprehensive Performance Evaluation (CPE) and the Conceptual Plan for the Modernization of the <br />project. The two reports were ordered by the USEPA following a boil -water advisory that was issued to nearly 1 <br />million people in December of 1993. <br />Hudson River Supply Alternatives Project for the New York City Department of Environmental Protection <br />Client: Bureau of Water Supply and Wastewater Collection <br />Title: Quality Assurance Manager <br />Project investigated mid-term alternatives for the pumping and treatment of 100 mgd, 200 mgd, and 300 mgd <br />from the Hudson River supply. Long-term alternatives investigated capacities of 400, 800, and 1,200 mgd. <br />80 mgd Val Vista Water Treatment Expansion and Upgrade Project <br />Client: City of Phoenix, Arizona <br />Title: Project Manager <br />Performed predesign, design and cost estimating for the design of a 140 mgd raw water pump station, grit <br />removal, pre -sedimentation, and flocculation / sedimentation. <br />Sydney Water Board BOOT Tender Submission Project <br />Client: City of Sydney, Australia <br />Title: Project Manager <br />Development of conceptual designs for four new water treatment plants that were planned to be constructed in <br />Sydney, Australia. The four plants included the 4200 ML/day (1,100 mgd) Prospect WTW, 600 MIL/clay (158 mgd) <br />Macarthur WTW, 210 M/day (58 mgd) Woronora WTW, and 190 ML/day (53 mgd) Illawarra WTW projects. <br />40 mgd Lower Otay Filtration Plant Expansion Project <br />Client: City of San Diego <br />Complete rehabilitation of the existing plant and the construction of a new 75 mgd (1,050 HP) raw water pump <br />station, rapid mixing, two flocculation and sedimentation basins, and 8 new filters. Other new facilities included <br />chemical feed and storage, a 3,100 square foot expansion of the existing Operations Building, and a 600 kW <br />emergency system. Responsible for predesign and design. <br />30 mgd RobertA. Perdue Pretreatment Addition and Modifications Project <br />Client: Sweetwater Authority <br />Complete rehabilitation of the existing treatment plant and the addition of a new facility, including rapid mixing, 2 <br />two -stage flocculation and sedimentation basins, chemical feed and storage, chlorine feed and storage, and a <br />2,600 square foot expansion of the existing Operations Building. Responsible for predesign, design, and <br />construction management. <br />90 mgd Escondido -Vista Water Treatment Plant Expansion <br />Client: City of Escondido <br />Expansion of the existing 37.5 mgd facility to 90 mgd. New treatment facilities included the construction of two <br />sedimentation basins, each with four stages of flocculation, four filters, sludge equalization, activated carbon feed <br />and storage, and other new chemical feed and storage systems. Responsible for design and construction <br />management. <br />PROFESSIONAL AFFILIATIONS <br />American Public Works Association <br />American Water Works Association <br />San Diego County Water Works Group <br />0 RICHARD BRADY &ASSOCIATES, INC. E-27 <br />25B-105 <br />