My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-04-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/07/2020
>
FULL PACKET_2020-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2020 9:41:11 AM
Creation date
4/2/2020 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/7/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resume <br />Nick Coates, PLS I Project Surveyor <br />Mr. Coates has over 37 years of diverse, worldwide surveying <br />experience in both the field and office performing many types of <br />Education <br />surveying including vertical and horizontal control, photo control, <br />GPS surveys, topographic surveys, design surveys, boundary <br />• HNC Land and Engineering <br />surveys, Right of Way surveys, monitoring surveys and construction <br />Surveying, Polytechnic of <br />layout. <br />the Southbank, London, UK <br />Registrations/Certifications <br />Experience <br />• CA, Professional Surveyor <br />No. 9306 <br />Project: Sheep Creek Reservoir <br />Location: Wrightwood, CA <br />• MO, Professional Surveyor <br />Client: Golden State Water Company <br />No. 2008000716 <br />Role: Project Surveyor <br />Survey to support the design of approximately 1000' feet of new <br />water pipeline from the Sheep Creek Reservoir to the mainline <br />Areas of Expertise <br />connection. <br />• Project Coordination <br />Project: Redlands Water Treatment Plant <br />• Data Management <br />Location: Redlands, CA <br />Client: City of Redlands <br />• Survey Systems <br />Role: Project Surveyor <br />Aerial Mapping and Design Surveys to support the reconfiguration <br />• GIs <br />of the City of Redlands Water Treatment Plant. Coast Surveying also <br />provided a Boundary Survey of the site. <br />Project: Medical Center Drive <br />Location: Mission Viejo, CA <br />Client: Moulton Niguel Water District <br />Role: Project Surveyor <br />Design Survey and Boundary Survey to support the design of anew <br />water main pipeline from Marguerite Parkway to the Mission <br />Hospital in Mission Viejo along with a survey of part of the hospital <br />ground for the installation of a reservoir. The project also included <br />the preparation of Legal Descriptions and Exhibits for proposed <br />easements. <br />Project: New Well 14 and Storm Drain Project <br />Location: Huntington Beach, CA <br />Client: City of Huntington Beach <br />Role: Project Surveyor <br />This project, which combined a survey for a new water well with a <br />survey for the design of a new storm drain, required Coast surveying <br />to provide a design survey and Right of Way Survey of <br />approximately 2000' of McFadden Boulevard and a topographic and <br />boundary survey in an adjacent area of undeveloped land in the City <br />RICHARD BRADY &ASSOCIATES, INC. <br />E-41 <br />25B-119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.