My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-04-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/07/2020
>
FULL PACKET_2020-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2020 9:41:11 AM
Creation date
4/2/2020 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/7/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />Fee Summary <br />RICHARD BRADY ; ASSOCIATES <br />Cost Proposal for City of Santa Ana <br />RFP Number: 19-105 Program Manager: <br />Engineering Services for Seismic <br />Project Title: and Structural Start Date: <br />Assessment <br />Proposal Date: 11/14/2019 End Date: <br />Richard Brady, P.E., <br />BCEE <br />TBD <br />TBD <br />Labor Category <br />Code <br />Labor Rate <br />Labor Hours <br />Cost <br />Principal -in -Charge / Senior Program Manager <br />P6 <br />$ 245.00 <br />238.0 <br />$58,310 <br />Principal Engineer <br />P6 <br />$ 245.00 <br />678.0 <br />$166,110 <br />Managing Engineer <br />P5 <br />$ 210.00 <br />40.0 <br />$8,400 <br />Senior Engineer / Project Manager <br />P4 <br />$ 175.00 <br />856.0 <br />$149,800 <br />Project Engineer <br />P3 <br />$ 155.00 <br />264.0 <br />$40,920 <br />Associate Engineer <br />P1 <br />$ 120.00 <br />187.3 <br />$22,474 <br />Senior Designer <br />D3 <br />1 $ 160.00 <br />1 92.0 <br />1 $14,720 <br />Total Labor Cost <br />2,355.3 <br />$460,734 <br />Estimated Travel Costs <br />Travel <br />$ - <br />Total Travel Cost <br />$ - <br />Estimated ODCs (Subcontractors, Materials, Supplies, Reproduction, etc.) <br />Geotechnical Reports <br />Nova Services <br />$50,000 <br />Site Survey <br />Coast Survey <br />$37,500 <br />Corrosion Assessment <br />V&A Engineering <br />$35,000 <br />Service Center Charge <br />$6.00/Hour <br />$14,132 <br />Reproduction <br />$ - <br />Subtotal ODCs <br />$136,632 <br />G&A on ODCs (excl Travel) <br />9.00% <br />$12,297 <br />Total ODC Costs <br />$148,929 <br />Profit on ODCs (excl Travel) <br />10.00% <br />$14,893 <br />Total ODC Cost <br />$163,821 <br />Total Estimated Project Cost <br />$624,555 <br />FEE_Siesmic and Structural Assessment_REV2 ro�s�i� 11/13/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.