Laserfiche WebLink
N <br />TETRATECH Man Hong (Eric) Yuen, RE., S.E. <br />Structural Project Manager <br />Mr. Yuen has over 12 years of experience in the design, analysis and detailing in <br />Project Role: <br />structural engineering. He is knowledgeable in reinforced concrete, masonry, <br />Project Manager <br />structural steel and wood frame design, and construction for a variety of budding <br />and infrastructure projects including reservoirs, water/wastewater treatment <br />Education: <br />facilities, as well as seismic retrofit of existing structures. <br />M.S., Civil and Structural <br />Engineering, California State <br />EXPERIENCE <br />Polytechnic University, Pomona <br />2016 <br />Hunting Horn Reservoir Structural/Seismic Evaluation, City of North <br />B.S., Civil Engineering, California <br />Tustin, CA, Golden State Water Company, 2019 As Project Manager, Mr. <br />State Polytechnic University, <br />Yuen is responsible for the overall project to provide professional <br />Pomona,2007 <br />engineering/technical services including onsite reconnaissance inside the <br />Registrations/Certifications: <br />reservoir to prepare a structural and seismic study and evaluation. The Hunting <br />Professional Engineer, California <br />Horn Reservoir is a semi -buried reinforced concrete cylindrical water tank that <br />2009, No. 75983 <br />was first constructed in 1900, converted to concrete in 1918, and gunite-lined in <br />1950. The reservoir has a capacity of 0.44 MG, measures approximately 72 feet <br />P h' PP Y <br />Structural Engineer, California <br />2014, No. 6177 <br />in diameter and 16 feet high and has a wood frame roof. Over the years it has <br />developed cracks in the interior shell that have been patched and has a slow leak <br />Structural Engineer, Oregon <br />that is visible from the exterior and requires assessment and repair. Tetra Tech <br />2019, No. 94532PE <br />prepared a comprehensive engineering study and seismic evaluation of the tank <br />Professional Engineer, Colorado <br />to examine the alternatives available to GSWC for either repair or replacement. <br />2019, No. 56159 <br />Lower Acacia Reservoir (1-D) Structural Rehabilitation, Design Phase <br />Services and Construction Management, City of Fullerton, CA 2017-2019 — Cal DES Safety Assessment <br />Project Manager responsible for the inspection and engineering services, Program Evaluator Training <br />structural rehabilitation Design Phase, Bid Phase and Construction Support Professional Affiliations: <br />Services for the improvements to the Lower Acacia Reservoir, a 4MG American Institute of Steel <br />rectangular concrete tank predominately buried constructed in 1964. Construction <br />13th Street Underground Reservoir Structural Retrofit, City of Ontario, CA <br />Field Safety Certifications <br />2012 — Mr. Yuen served as Structural Design Engineer for this project. The <br />primary objective of this project was to reduce the potential damages to the <br />Fall Protection (Ladders, <br />Scaffolding, Aerial Lifts) <br />reservoirs in the aftermath of an earthquake that may jeopardize public safety <br />312018 <br />both in the local Upland neighborhood they are located in or the Ontario <br />community they serve miles away. <br />H2S Protection Training <br />Respiratory Protection Training <br />In 2008, the City had a Reservoir Seismic Vulnerability Evaluation Report <br />Confined Space Training <br />(Seismic Report) performed by Tetra Tech on all of its reservoirs to determine <br />(912019) <br />their ability to resist current seismic code loads. The Structural Evaluation of the <br />office: <br />Report evaluated each of the seismic force resisting components of each of the <br />San Dimas, California <br />reservoirs and provided seismic retrofit recommendations for those found to be <br />deficient. The recommended retrofit recommendation for the 13th Street <br />Years of Experience: <br />Reservoir is a cast -in -place reinforced concrete overlay which is added to the <br />(2007)12 <br />walls, roof, and floor of each reservoir. <br />The Preliminary Engineering Design Phase will include the necessary <br />Years with Tetra Tech: <br />engineering services that will confirm the findings and recommendations of the <br />(2007)12 <br />2008 Seismic Report (or recommend another less time consuming, cost-effective <br />alternative) and result in the production of the a Preliminary Design Report <br />(PDR) and preliminary design drawings that will be used as a basis for the Final <br />Design and ultimately, the Final Construction Documents. <br />25B-178 Page <br />