My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERNATIONAL LINE BUILDERS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
INTERNATIONAL LINE BUILDERS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 11:50:40 AM
Creation date
4/2/2020 11:14:59 AM
Metadata
Fields
Template:
Contracts
Company Name
INTERNATIONAL LINE BUILDERS, INC
Contract #
P 17-6875
Agency
Public Works
Council Approval Date
1/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECTNO., 17-6875 <br />CITYWIDE TRAFFIC SIGNAL VEHICLE BEAD UPGRADES <br />FEDERAL PROJECT NO; HSIPL 9063(188) <br />DIFFERING SITE CONDITIONS <br />The undersigned, is submitting this proposal for performing by contract the work required by <br />these bid documents, certify to comply with the following: <br />a, Contractor's Notification <br />Promptly notify the Agency's Engineer if you find either of the following conditions: <br />I. Physical conditions differing materially from either of the following: <br />• Contract documents <br />• Job site examination <br />2. Physical conditions of an unusual nature, differing materially <br />from those ordinarily encountered and generally recognized as <br />inherent in the work provided for in the Contract <br />Include details explaining the information you relied on and the material <br />differences you discovered. If you fail to promptly notify the Engineer, you waive <br />the differing site condition claim for the period between your discovery of the <br />differing site condition and your notification to the Engineer. <br />If you disturb the site after discovery and before the Enginecr's investigation, you <br />waive the differing site condition claim. <br />b. E'rzgineer's Investlgatfon axut Decision <br />Upon your notification, the Engineer investigates job site conditions and: <br />I. Notifies you whether to resume affected work <br />2. Decides whet he condition differs materially and is cause for an <br />adjustment of tim , payment, or both <br />Signed <br />Title <br />Firm International Line Builder's Inc. _; <br />Date 10/30/2019 <br />P-35 of P-38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.