My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING, INC (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING, INC (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 11:50:17 AM
Creation date
4/7/2020 8:49:00 AM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING, INC.
Contract #
20-6956 , 20-6437
Agency
Public Works
Council Approval Date
1/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The Total Aggregate Limit for all Projects and Locations shown in the Schedule of this endorsement is the <br />most we will pay for the sum of all damages caused by "occurrences" under Section I — Coverage A and <br />all medical expenses caused by accidents under Section I — Coverage C which can be attributed only to <br />ongoing operations at a designated construction project or designated 'location" shown in the Schedule of <br />this endorsement, regardless of the number of construction projects, 'locations", 'occurrences" or <br />accidents. <br />6. Each Designated General Aggregate Limit is subject to the Total Aggregate Limit for all Projects and <br />Locations shown in the Schedule of this endorsement. <br />B. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under <br />Section I — Coverage A. and for all medical expenses caused by accidents under Section I - Coverage C, <br />which cannot be attributed only to ongoing operations at a single designated construction project or single <br />designated 'location": <br />1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall <br />reduce the amount available under the General Aggregate Limit or the Products -Completed Operations <br />Aggregate Limit, whichever is applicable; and <br />2. Such payments shall not reduce any Designated General Aggregate Limit. <br />C. When coverage for liability arising out of the "products -completed operations hazard" is provided, any <br />payments for damages because of "bodily injury" or "property damage" included in the "products -completed <br />operations hazard" will reduce the Prod ucts-Com plated Operations Aggregate Limit, and not reduce the <br />General Aggregate Limit nor the Designated General Aggregate Limit. <br />D. If the applicable construction project has been abandoned, delayed, or abandoned and then restarted, or if the <br />authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project <br />will still be deemed to be the same construction project. <br />E. For the purposes of this endorsement, the Definitions Section is amended by the addition of the following <br />definition: <br />"Location" means any premises that you occupy for permanent operations as part of your business, but does <br />not include any premises at which you are performing operations as part of a construction project. All <br />premises involving the same or connecting lots, or premises whose connection is interrupted only by a street, <br />roadway, waterway or right-of-way of a railroad shall be considered a single "location". <br />F. The provisions of Section III - Limits Of Insurance not otherwise modified by this endorsement shall continue <br />to apply as stipulated. <br />LC 25 10 01 15 ( Wp0r& fpt�tijRR��rtee Page 2 of 2 <br />Includes copyrighted ny� ktf jp Atixw servMl ftt��, Inc., with its permission. <br />E 0 020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.