Laserfiche WebLink
A-2009-214-05 <br />TRAFFIC SIGNAL <br />MAINTENANCE AGREEMENT <br />THIS TRAFFIC SIGNAL MAINTENA <br />NCE AGREEMENT (herein referred to as the <br />"Agreement") is entered into as of this E i — day of /t J/�/1L1� 2012, by and between the <br />CITY OF ORANGE, a municipal corporation (herein referred to as the "ORANGE"), CITY <br />OF SANTA ANA, a Charter City and municipal corporation (herein referred to as the "SANTA <br />ANA"), and VISTA DEL RIO HOUSING PARTNERS L.P., a California limited partnership <br />(herein referred to as the "Property Owner"). <br />WHEREAS, Property Owner owns real property in the City of Santa Ana, County of <br />Orange, State of California, described in legal descriptions and depicted as Exhibit A attached <br />hereto and incorporated herein by this reference (the "Site"); and <br />WHEREAS, it is the desire of Property Owner to obtain a modified signalized <br />intersection for vehicular access to the Site to and from Memory Lane/The City Drive as shown <br />in plat maps as Exhibit B (the "Maps") and incorporated herein by this reference; and <br />WHEREAS, the subject modified signalized intersection is partially located in the <br />jurisdiction of ORANGE and partially in the jurisdiction of SANTA ANA, and currently <br />maintained by ORANGE; and <br />WHEREAS, ORANGE has agreed to continue to maintain the traffic signals and safety <br />lighting at the signalized intersections for such vehicular access as shown on the Maps, subject to <br />the conditions listed below; and <br />WHEREAS, this agreement will supersede all previous applicable maintenance and <br />operation agreements pertaining to the traffic signal at Memory Lane/The City Drive <br />intersection. <br />NOW, THEREFORE, IT IS AGREED by and between ORANGE, SANTA ANA, and <br />the Property Owner as follows: <br />1. The Property Owner has prepared plans, specifications and estimates for the Site <br />improvements including traffic related plans prepared by Austin -Foust Associates, Inc. (herein <br />referred to as the "Plans"), which Plans have been approved by ORANGE and are on file with <br />ORANGE's Public Works Department. The Property Owner hereby agrees to and shall be <br />responsible for the construction and installation, at its sole cost and expense, of all work and <br />improvements, (hereinafter, the "System"), reflected on the Plans in accordance with the plan <br />specifications. The Property Owner shall carry out the construction of the System on the Site in <br />conformity with all applicable laws, including all applicable federal and state labor standards, <br />including, but not limited to, the payment of prevailing wages. <br />2. The Property Owner acknowledges and agrees that the construction of the System <br />constitutes a public work under applicable state law, and the Property Owner shall abide by all <br />