My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AC pavement, signage and striping, and other appurtenant work. Virtual Project Manager software was <br />used for tracking submittals, RFIs, and change order requests. <br />Client: City of Ridgecrest Contact: Loren Culp, City Engineer <br />Year Completed: 2017 (760) 499-5082 <br />Willdan provided bidding assistance, construction management, inspection, <br />materials testing, and labor compliance services for this sewer main <br />rehabilitation and replacement project. The project included 6,890 linear <br />feet of sewer rehabilitation via cured -in -place -pipe lining, 5,130 linear feet of <br />sanitary sewer replacement, point repairs, reconnection of 172 laterals with <br />Brim style inserts, and manhole reconstructions and rehabilitations. <br />Following compliance of the sewer main replacements, an AC overlay was <br />constructed for the limits of the project on Church Street, from Downs <br />Street to China Lake Blvd. <br />Client: City of Downey Contact: Lorena Powell, Associate Civil Engineer <br />Year Completed: 2018 (562) 904-7117 <br />Client: City of Downey Contact: Lorena Powell, Associate Civil Engineer <br />Year Completed: 2019 (562) 904-7117 <br />Willdan provided construction management, inspection, and material testing s <br />services for this water system improvements project on Paramount <br />Boulevard between Firestone Boulevard and Florence Avenue. The project <br />involved the installation of new 6" and 8" ductile iron potable water main, <br />gate valves, tee's and bends, thrust blocks, and fittings; installation of new <br />fire hydrant assemblies, water service lines, meters and boxes; and other` <br />appurtenant work. Procore software was used for tracking submittals, RFIs, and change order requests. <br />Client: Liberty Utilities (Formerly Park Water) Contact: Jim Elliott, PE, Chief Engineer <br />Year Completed: Present Contract (562) 299-5124 <br />Willdan has been providing public works observation services to Liberty <br />Utilities (formerly Park Water Company) for over 16 years. In the past three <br />years, Willdan has provided contract administration and inspection on well <br />over 24 water main projects involving installation of ductile iron and PVC <br />water mains, fire hydrants, service meter change -outs, bridge construction <br />with water line incorporated into the structure, reservoir rehabilitation, wells <br />and other appurtenant work. <br />Statement of Qualifications for Water Resources <br />6 Construction Management and Inspection Services <br />25F-101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.