Laserfiche WebLink
the data. Some of the <br />things the use of LiDAR <br />allows the Construction <br />Management Team to do <br />include: <br />■ Better manage the <br />contractors' quantities <br />■ Confirm the proper <br />amount of base is used <br />rather than additional <br />asphalt <br />■ Confirms proper <br />excavation <br />■ Provide millions of <br />additional data points <br />than traditional survey <br />for better as -built <br />information <br />■ Confirms as -bid conditions prior to construction <br />Innovative Daily Reports <br />Daily reports are the single most important <br />document a construction management team can <br />produce on a project. Daily reports can protect <br />the City and verify the contractor is completing <br />the work per the plans and specifications. One <br />innovative thing Psomas has added to our daily <br />reports is the inclusion of marked -up plan sheets <br />that reference the work done for that particular <br />day. The image above illustrates this innovation. <br />Assumptions and Exclusions <br />Psomas has no assumptions and/or exclusions. <br />IIll AIAV I1 Ill d:J[Z6a1X01 <br />EXPERIENCE <br />Below is a list of projects that have been <br />completed by Psomas in the last five years, <br />which includes work with Public Agencies. <br />or m:er <br />s oar ��_ova <br />s' <br />1 <br />Mom«®® <br />Rehabilitation of West Garden <br />Grove Well 22/13ooster Pumping <br />Facility <br />Garden Grove, CA <br />This project began with a preliminary <br />investigation of the existing facility. The <br />preliminary investigations included a four -day <br />condition assessment of the existing facility; <br />hydraulic testing of three booster pumps and <br />one well pump; well production and efficiency <br />testing; vibration testing of the pumping and <br />engine equipment; efficiency testing of natural <br />gas engines; and coordination with AQMD <br />for revisions to existing air quality permit. A <br />Preliminary Design Report was prepared which <br />PSOMAS RFP No. 19-118 1 On -Call Wal�ls uccgs1or(attion Management and Inspection Services I City of Santa Ana <br />