My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nick King, PE <br />Construction Manager <br />REGISTRATION <br />2011/CA/Professional <br />Engineer/ C i v i I/# 78599 <br />EDUCATION <br />2005/BS/Civil <br />Engineering/Northern <br />Arizona University <br />EXPERIENCE <br />With Psomas for 2 years; <br />with other firms for 15 <br />years <br />Nick King has 17 years of professional experience in construction <br />management, administration and design support of transit, road, and <br />bridge projects. Nick started in this industry as a laborer on a road <br />construction project and quickly moved up the ranks through education <br />and work experience. Nick as a strong multidisciplinary background, a <br />proven record in leading collaborative efforts and developing consensus <br />between across engineering disciplines. For the past eight years, Nick <br />has worked on some of the largest projects in California using a variety <br />of delivery methods. Nick also spent four years in the U.S. Army, and is <br />currently enlisted in the Army National Guard. <br />Experience <br />As -Needed Engineering Services for the Implementation of the <br />LACMTA Purple Line Extension, Beverly Hills, CA: Project Engineer <br />on the Psomas Team to provide full -service project and construction <br />management services to the City of Beverly Hills on an as -needed basis <br />and to serve as an agent for the residents and businesses of the City <br />during construction of Metro's Purple Line Subway Project. Services <br />include project management, design review, review and development of <br />interagency agreements, review and development of permit conditions, <br />construction management and oversight services, constructability and <br />construction schedule review, community outreach, city council and <br />commission presentations, QA/QC and document control. Segment 2 <br />Manager representing the City of Beverly Hills in a staff augmentation <br />role during the construction of the Westside PLE, Section 2, which runs <br />almost 3-miles down Wilshire to Constellation Boulevard. Responsible <br />for overseeing a team who are responsible for verifying the City's <br />interests are protected and adhered to during construction as part of the <br />Memorandum of Agreement between the City and Metro. <br />Gerald Desmond Bridge Replacement Project, Port of Long Beach, <br />CA: Lead Construction Engineer providing oversight of materials quality <br />control program on a $1.2 billion bridge project. Designed and populated <br />a Microsoft Share Point based document database for materials quality <br />and non-conformance related documents. Performed claims analysis, <br />establishing absence of contractual merit for several claims, developed <br />the negotiating leverage to reduce the client's liability for several more, <br />and prepared the related correspondence and documentation for the <br />project record. Attended meetings with the design -builder on behalf of <br />the POLB, performed oversight/auditing of the design/builder's materials <br />quality assurance program, and coordinated certain materials related <br />IQAfunctions (such as destructive and non-destructive sampling and <br />testing). Also a key contributor to the development and refinement of PM/ <br />CM document control and workflow protocols for change management, <br />quality, RFls, submittals, and change orders. <br />RFP No. 19-118 1 On -Call Water Resources Construction f2 5 F -1 73 <br />Services I City of Santa Ana PSOMAS <br />
The URL can be used to link to this page
Your browser does not support the video tag.