Laserfiche WebLink
CONTACT INFO <br />PETER SALGADO, PE <br />peter.saIga949.585.04 o@nv5.com <br />949.585.0477 <br />Constructability Review + Construction Manager <br />................................................................................................................................................................................. . <br />EXPERIENCE <br />With more than 20 years of experience, Mr. Salgado has managed and delivered <br />20 years <br />a variety of public works projects, including street improvements, vertical <br />EDUCATION <br />construction and tenant improvements, parks and landscaping improvements, <br />B.S. Civil Engineering <br />and water, sewer and storm drain improvements. Working with a variety of <br />agencies, he is thoroughly familiar with local, state and federal procedures. <br />LICENSES <br />Civil Engineer (CA) <br />Project Experience <br />No. 63159 <br />.................................................................................................................................................................................. <br />AVAILABILITY <br />Krum Reservoir and Pipeline Stabilization <br />40%u <br />CITY OF SAN JUAN CAPISTRANO I SAN JUAN CAPISTRANO, CA <br />Project Manager. Mr. Salgado was responsible for overseeing the <br />construction management and inspection team for this $5.4M project to <br />stabilize an existing reservoir and pipeline impacted by the Avenida Placida <br />Landslide. Scope of work included major remedial grading and the installation <br />of caissons and tie -backs. The project was successfully completed with no <br />major disruptions to the City's water service. <br />Citywide Sewer Main Replacement <br />CITY OF TORRANCE I TORRANCE, CA <br />Construction Manager. Mr. Salgado managed the project that provided <br />construction inspection services for this citywide sewer main improvement <br />project. The project included rehabilitating the existing sewer system in various <br />locations throughout the City. The scope of work included point repairs, removal <br />and replacement, pipelining sections of sewer where damage was repaired by <br />insertion of a plastic liner, thereby eliminating the need for trench excavation and <br />minimizing public impacts. Where trench excavation was required, damaged <br />sections of pipe were replaced with new vitrified clay pipe (VCP). <br />SC04 Pipeline Project <br />CITY OF SAN JUAN CAPISTRANO I SAN JUAN CAPISTRANO, CA <br />Project Manager. Mr. Salgado was responsible for overseeing the construction <br />management and inspection team for this $6M project. The project included <br />25,000 LF of 24-inch diameter welded steel water pipe to deliver water to the <br />rapidly developing southeastern section of the City. A majority of the pipeline was <br />constructed along existing ridgelines in the City's open space, which entailed <br />deep trenching and two jack -and -bore operations totaling 900 feet in length. <br />Shaw's Cove Lift Station Rehabilitation <br />CITY OF LAGUNA BEACH I LAGUNA BEACH, CA <br />Construction Manager. Mr. Salgado managed this $1.5M project that was to <br />rehabilitate an existing sewer lift station. Improvements included construction <br />of a new wet and dry well, installation of new pumps as well as new piping and <br />valving, installation of a stand-by diesel generator, and construction of a new <br />force main. The project also included trench restoration, roadway reconstruction <br />V <br />5 <br />and resurfacing, and traffic striping and signage. Specific issues included a <br />construction site in a confined canyon adjacent to one of the City's popular <br />recreation beaches. The confined area entailed complex excavation and shoring <br />activities to allow construction of the new wet and dry wells. The project was <br />successfully completed without impacting beach access during construction. <br />