Cost Estimate
<br />CONTRACT AMENDMENT No. 1 - Cost Estimate (2/7/20, updated 4/4/201
<br />Task
<br />Description
<br />Original Contract
<br />Contingency
<br />1
<br />Total Contract
<br />with
<br />Contingency 1
<br />Contract#1 Ra at
<br />Total Contract
<br />wlAmend 91
<br />PlaceWorks
<br />IBI
<br />Total
<br />Amend 1
<br />TASK 9.
<br />TECHNICAL $TUDESTOR THE,UNERAL;DI:AN'V34AT.- .
<br />1.1
<br />Tmffle Anal sls IBI
<br />General Plan EIR Original Scope
<br />$72,426
<br />$72,426
<br />$0
<br />$0
<br />$0
<br />$72,426
<br />OCTA Coordination
<br />10,160
<br />11,176
<br />11,176
<br />Traffic Modeling and Analysis
<br />36,660
<br />40,326
<br />40,326
<br />Expanded Traffic Report
<br />6,120
<br />6,732
<br />6,732
<br />1.2
<br />Air Quall(yIGHG Analysis
<br />21,191
<br />21,191
<br />0
<br />0
<br />0
<br />21,191
<br />1.3
<br />Cultural heritage Resource Study (Chattel)
<br />43,428
<br />43,428
<br />0
<br />0
<br />0
<br />43,428
<br />1.4
<br />Noise Anal sis
<br />20528
<br />20,528
<br />0
<br />1 0
<br />0
<br />1 20,528
<br />1.5
<br />Hydrology , Water Quality, and Infrastructure FUSCOE
<br />26,118
<br />1,980
<br />28,098
<br />0
<br />0
<br />0
<br />28,098
<br />1.6
<br />Potable Water and Sanitary Sewer
<br />28,897
<br />1,320
<br />30,217
<br />0
<br />0
<br />0
<br />30,217
<br />17
<br />Service Level Study for Fire and Police
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />1.8
<br />Geology, Soils,. and Natural Hazards
<br />7,711
<br />7,711
<br />0
<br />0
<br />0
<br />7,711
<br />1.9
<br />Biological Resources Carlson
<br />13,332
<br />1,738
<br />15,070
<br />0
<br />0
<br />0
<br />15,070
<br />' Task Subtotal
<br />233831
<br />5,038
<br />238,669
<br />0
<br />52,940
<br />58,234
<br />269903
<br />TASK 2,ENVIRONMENTA6DOOUMENtA:fb6kiBR'024J}AM"40) Cc
<br />'.,..: .. ". .: s
<br />77-7
<br />Subtotal
<br />147
<br />February 7, 2020(revlsed Apr119, 2020) 1 Page 1
<br />25G-11
<br />
|