My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMENDMENT FOR GENERAL PLAN IMPACT REPORT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25G - AMENDMENT FOR GENERAL PLAN IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:54 PM
Creation date
4/16/2020 12:53:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
4/21/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Analysis will require updating to ensure consistency with the future conditions traffic analysis. IBI Group will prepare <br />a draft and final version of the updated Existing Conditions Analysis for review by PlaceWorks and the City of Santa <br />Ana. <br />Expanded Future Conditions Trafi3cAnalysis <br />The original traffic study scope of work assumed IBI Group would analyze up to 40 Intersections and 60 roadway <br />segments. With the expanded list of study intersections resulting from the geographic spread of areas with proposed <br />land use changes in the General Plan Update coupled with the study area included as part of the Circulation Element <br />Update, the proposed number of study intersections has expanded to a minimum of 110 locations. This is an increase <br />of 70 intersections above the base scope of work. <br />The scope for this amendment task assumes the additional work efforts associated with analyzing 70 more <br />intersections (110 total) and 25 more roadway segments (85 total) as part of the traffic study conducted for the <br />General Plan Update EIR. IBI Group has also assumed that only one of the two land use alternatives will be fully <br />analyzed and documented in the traffic study. <br />After obtaining and processing the model data, a level of service (LOS) analysis at the additional study area <br />intersections and roadway segments will be conducted and summarized. IBI Group will identify areas that would not <br />achieve the City's LOS standards and will determine necessary improvements to achieve those standards. The <br />Intersections will be field reviewed to verify the preliminary feasibility of the proposed improvements, and the <br />resulting level of service at the impact locations will be quantified. <br />Expanded Traffic Study Report <br />IBI Group's original scope of work assumed preparation of draft and final traffic studies in support of the EIR. With the <br />expanded number of study intersections and roadway segments, this analysis will require additional effort to prepare <br />and complete the draft and final versions of the traffic study, including additional text and figures. <br />Task 1.2 Air Quality/GHG Analysis <br />No additional scope is required for this task. <br />Task 1.3 Cultural Resources Analysis <br />No additional scope is required for this task. <br />Task 1.4 Noise Analysis <br />No additional scope is required for this task. <br />Task 1.5 Hydrology, Water Quality, and Infrastructure <br />No additional scope is required for this task. <br />Task 1.6 Potable Water and Sanitary Sewer <br />No additional scope is required for this task. <br />February 7, 2020 (revised April 9, 2020 1 Page 4 <br />25G-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.