REQUEST FOR PROPOSAL
<br />„TUIN
<br />a
<br />On -Call Water Resources Engineering Services
<br />(RFP NO.19-100) -.
<br />_ ,, _
<br />�.
<br />'Alll
<br />I'l
<br />JOHN Moynier, CFM, CEP
<br />Principal -In -Charge I CEQA I SWPPP/Water Quality
<br />YEARS OF EXPERIENCE:
<br />Background
<br />37
<br />Mr. Moynier is experienced serving water resource clients throughout
<br />EDUCATION:
<br />the west and serves as Michael Baker's Regional Water Resources
<br />BA, Conservation and Analysis
<br />Practice Executive. Mr. Moynier is a recognized expert in the integration
<br />of Ecosystems, UCLA
<br />of floodplain management, water quality, water supply, and water
<br />Graduate Studies, Computer
<br />resource planning, and has split his career between the public and
<br />Mapping/GIS, UCLA
<br />private sectors. He has extensive experience in compliance with the
<br />Graduate Certificate, Land Use
<br />CEQA and NEPA, as well as a broad range of other water resource
<br />Planning, University of
<br />regulations, including the Clean Water Act, Porter -Cologne Act, and the
<br />California, Davis
<br />California Inland Surface Waters program. Mr. Moynier is an elected
<br />LICENSES/CERTIFICATIONS:
<br />member of the Board of Directors for the Floodplain Management
<br />Certified Floodplain Manager,
<br />Association (FMA), as well as the National Association of Environmental
<br />USA and Canada, 2008, US -
<br />Professionals (NAEP).
<br />08-03663
<br />Relevant Experience Certified Environmental
<br />Professional, USA and
<br />Olivas Park Drive Extension and Levee, Ventura, California. City of Canada, 2014, 1401431
<br />Ventura. Project Manager. Michael Baker prepared final engineering
<br />design for the construction of an earthen levee and floodwall system
<br />associated with the Olivas Park Drive roadway extension project. Michael Baker also completed plans,
<br />specifications, and estimates (PS&E) for the roadway extension project. The levee project scope included
<br />analysis and design for a new levee system along the northern bank of the Santa Clara River located just
<br />downstream of the Highway 101 crossing. The Michael Baker team provided hydraulic and sedimentation
<br />analyses, developed alignments and type selection for the proposed improvements, and is completing final
<br />design for the recommended improvements.
<br />Santa Clara River Levee (SCR-3). Ventura County Watershed Protection District. Project Manager.
<br />Michael Baker provided final engineering design services for the SCR-3 for a two-mile reach downstream
<br />of Highway 101. The project goal is to correct these deficiencies and close the "gap" in the levee system.
<br />The construction of the project improvements will ultimately result in the ability to certify the levee system,
<br />provide flood protection for the City of Oxnard, and alleviate the mandatory flood insurance requirements
<br />for properties located in the Special Flood Hazard Area. Michael Baker refined the project to develop a
<br />comprehensive set of alternatives to be considered and prepared cost estimates and evaluation of the
<br />alternatives to identify a recommended project. Michael Baker prepared final PS&E for the recommended
<br />project, which includes earthen levee improvements, concrete floodwall, and automated flood gate at the
<br />roadway crossing.
<br />Placer County Flood Risk Project, Auburn, California. Placer County Flood Control and Water
<br />Conservation. Principal -In -Charge. Responsible for serving as Principal in Charge and as a technical
<br />advisor for the third phase of a floodplain mapping project in Placer County. Previously served as Project
<br />Manager for Phase 1. The objective of this Flood Risk Project is to support development and finalization
<br />of select Flood Insurance Rate Maps and Flood Insurance Study reports for Placer County. Five new
<br />detailed studies for the watersheds of Coon Creek, Doty Ravine, Blackwood Creek, Tahoe Vista Creek
<br />and Griff Creek will be prepared while existing, effective detailed studies for six other watersheds (including
<br />South Branch Pleasant Grove Creek, Secret Ravine Upper Fork/Loomis Tributary, Dry Creek, Cirby Creek,
<br />Linda Creek and Markham Ravine) will be revised and finalized. Letter of Map Revision applications will
<br />also be incorporated, if available.
<br />ProposaMR 1322 On -Call Water Resources RFP No. 19-100
<br />INTERNATIONAL
<br />
|