Laserfiche WebLink
C <br />REQUEST FOR PROPOSAL <br />On -Call Water Resources Engineering Services <br />(RFP NO.19-100) , <br />Safa Kamangar, PE, PMP, CCM, QSD/P, ENV SP <br />System Rehabilitation Conditions Assessment Task Lead , <br />Water Mains Task Lead, Pump Station PRV Task Lead, Wells <br />Background <br />Mr. Kamangar brings over 21 years of experience in water, wastewater, <br />and water reuse, planning, design, and construction management in <br />both the private and public sectors. His previous experience includes <br />design engineering, staff augmentation, on -call contract consultation, <br />program management, design -build owner's representative, <br />construction management, and resident engineering. As a design <br />engineer, Mr. Kamangar has performed hydraulic calculations, <br />mechanical design, detailed design drawings, development of <br />specifications, site work, and field calculations. As a construction <br />manager, he has been responsible for construction oversight, schedule <br />management, budget tracking, and contractor negotiations. <br />Relevant Experience <br />FY 18-19 Sewer System Rehab, Fountain Valley, California. City of <br />Fountain Valley. Technical Advisor. Michael Baker is providing services <br />for the project consisting of rehabilitation of twenty-eight sewer <br />segments within the City of Fountain Valley. Michael Baker evaluated <br />different rehabilitation options, including replacement, CIPP, pipe - <br />bursting, horizontal directional drilling, and sliplining and recommended <br />alternatives for final design. Michael Baker prepared final construction <br />documents for the project, including plans, specifications, and permits, <br />including several OCSD trunk connection permits, and provided <br />construction support. <br />`NWN <br />.. _ <br />1 �R <br />i A <br />YEARS OF EXPERIENCE: <br />21 <br />EDUCATION: <br />MS, Civil Engineering, <br />University of Tehran <br />BS, Civil Engineering, Azad <br />University, Iran <br />LICENSES/CERTIFICATIONS: <br />Professional Engineer, <br />California, 2006, C70118 <br />Project Management <br />Professional (PMP), 2015, <br />1863656 <br />Certified Construction Manager, <br />2016,6341 <br />Qualified SWPPP Developer <br />(QSD), California, 2012, <br />23059 <br />Envision Sustainability <br />Professional <br />OSHA 30-Hour Construction <br />Outreach Training <br />OSHA 40-Hour HAZWOPER <br />Certification <br />Confined Space Training <br />Western Regional Trunk Sewer Rehabilitation, Orange County, <br />California. Orange County Sanitation District. Technical Manager. <br />Michael Baker is providing engineering design services for the rehabilitation of four sewer reaches and <br />one pump station in Anaheim, Long Beach, Seal Beach, Cypress, Buena Park, and Los Alamitos; a total <br />of 84,000 linear feet of sewer line. Michael Baker's services include a utility survey and research; surveying <br />and mapping; a pipeline rehabilitation analysis; preparation of cost estimates and calculations; modeling <br />in Civil 3D; and preparation of technical memoranda and reports, contract drawings and details, and <br />contract specifications. <br />Magic Mountain Pipeline Design - Phase 6, Santa Clarita, California. Santa Clarita Valley Water <br />Agency. Project Manager. The project is part of a multi -phase pipeline project that connects the future <br />Magic Mountain Reservoir to the future Magic Mountain Pump Station, originally divided into six phases. <br />Phase 6 is the last segment of transmission pipeline that connects to the Phase 5 pipeline to the future <br />Magic Mountain Reservoir within the future development known as "Mission Village" by FivePoint. Due to <br />development phasing, the project was divided into two design packages — 6A and 6B. SCV Water retained <br />Michael Baker to provide final design services for the entire Phase 6 segment. In the preliminary design <br />phase of each segment, Michael Baker analyzed several different alignment alternatives in coordination <br />with the SCV Water and FivePoint's consultants. Final design of the entire project includes the following <br />tasks: design of 6,900-feet of 42-inch cement mortar lined and coated (CML&C) steel pipe and two-inch <br />PVC schedule, 40 fiber optic conduit, valve vaults with 42-inch motor actuated butterfly valves, a private <br />reservoir access road, and corrosion monitoring improvements. <br />Proposal R11'S�2 On -Call Water Resources RFP No. 19-100 <br />INTERNATIONAL <br />