My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewer Rehabilitation <br />Rossmoor/Los Alamitos <br />Area Sewer District <br />Rossmoor and Los Alamitos, CA <br />CLIENT CONTACT: Rossmoor/ <br />Los Alamitos Area Sewer District <br />3243 Katella Avenue, Los Alamitos, CA 90720 <br />Susan Bell, General Manager <br />(562) 431-2223 <br />YEAR COMPLETED: 2018 <br />KEY PERSONNEL: Maira Salcedo 1 Michael Swan <br />Benjamin Halbach Joseph Barrera <br />Psomas provided design of the sewer segment <br />rehabilitation in various locations in Rossmoor <br />and the City of Los Alamitos. Psomas staff <br />reviewed 60,000 feet of sewer system CCTV <br />tapes and made appropriate recommendations <br />for repairs where needed. The rehabilitation <br />design comprised a combination of CIPP <br />lining of approximately 2,830 feet of 8-inch <br />through 18-inch-diameter sewer in 11 separate <br />locations; UV -Cured Point Repairs (trenchless) <br />at 68 locations; removal and replacement of <br />approximately 860 feet of 8- and 10-inch-diameter <br />pipe in four areas; and point repairs to 8-inch <br />through 18-inch pipe at 14 different locations. <br />Psomas' responsibilities included preparation of <br />construction plans and specifications, bid phase <br />assistance, construction phase engineering, and <br />inspection services. <br />Coto de Caza Lift Station <br />Emergency Storage Basin <br />Rancho Santa Margarita, CA <br />CLIENT CONTACT. Santa Margarita <br />Water District <br />26111 Antonio Parkway, Rancho Santa <br />Margarita, CA92688 <br />Jaime Aguilar, PE, Senior Project Engineer <br />(949) 459-6582 <br />YEAR COMPLETED: Ongoing <br />KEY PERSONNEL: Nancy Baker Krista Kausen <br />Jennifer Marks Joseph Boyle <br />SUBCONSULTANT. Arcon J <br />Psomas provided engineering services for the <br />design of an emergency storage basin (ESB) <br />for Santa Margarita Water District's (SMWD's) <br />Coto de Caza Lift Station. SMWD has a policy <br />to install ESB's at each of its lift stations. The <br />purpose of the ESB is to contain wastewater <br />from overflowing into the surrounding area during <br />an emergency event. The ESB was designed <br />to provide storage volume for three hours of <br />average daily flows. The ESB is a reinforced <br />concrete structure approximately 45 feet by <br />45 feet with a depth of 30 feet. The ESB was <br />designed with three chambers. Submersible <br />pumps in the first chamber pump into the second <br />chamber with gravity flow from the second <br />chamber to the third chamber. Key design <br />features include design of the cast -in -place <br />concrete ESB; submersible pump selection; <br />coordination of an existing SDG&E power supply <br />line relocation; construction of a retaining wall <br />and concrete drainage Swale between the ESB <br />and access road; access improvements to allow <br />a tanker truck access to the ESB; and design <br />City of Santa Ana I On -Call Water Resources Engineering Se26 <br />IE1E 1.7m0 PSOMAS <br />
The URL can be used to link to this page
Your browser does not support the video tag.