Laserfiche WebLink
HOURLY RATE SCHEDULE <br />For Services by Psomas <br />Effective through December 2022 <br />Water and Wastewater Engineering Services <br />$ 95 — $105........Project <br />Assistant <br />$ 70 — $110 ........Engineering <br />Assistant, Intern <br />$105—$130....... <br />Civil Engineering Designer <br />$125—$140....... <br />Professional Engineer <br />$135—$200....... <br />Project Engineer <br />$190 — $220.......Project <br />Manager <br />$210 — $250.......Senior <br />Project Manager, QA/QC Manager, Principal -In -Charge <br />Surveying Services (Office Services) <br />$ 90 — $120........Administrative and Project Assistant <br />$100 — $125.......Photo Compiler <br />$105 — $150.......Staff Surveyor/CADD Technician/GIS Technician <br />$150 — $175.......Project Surveyor/GIS Specialist/Photogrammetrist <br />$175 — $185.......Sr. Project Surveyor/Sr. GIS Specialist <br />$185—$225....... Project Manager/Technical Manager <br />$225 — $250.......Principal <br />Surveying Services (Field Services) <br />Normal rates for field survey parties include normal usage of <br />field equipment and are fully equipped rates <br />$200 — $220.......One-man survey party <br />$315 — $335.......Two-man survey party <br />$415—$435....... Three-man survey party <br />$165 — $175.......Field Supervisor <br />Construction Management Services <br />$230 <br />$210 <br />$200 <br />$170 <br />$ 95 <br />.Contract Manager <br />.Construction Management QA/QC <br />.Construction Manager/Resident Engineer <br />.Inspector <br />.Administrative Support <br />PSOMAS <br />2 5 E —2 1 / I Water Resources Engineering Services I City of Santa Ana <br />