My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />Pipeline Projects by Project Team <br />Size (in) Design <br />Project Name Complete <br />7otabndRecycled Water (over 200 miles in last 15 years) <br />d Water Main Replacement (Annual) 150,000 8" 2002 - 2019 <br />Katella Ave. Water Main Replacement 6,800 8"-12' 2017 <br />na Water Main Replacement (5 projects) 50,000 8"-12' 2007 - 2017 <br />Upper San Gabriel Valley <br />MWD <br />Phase 1113 Package 3 RW <br />20,000 <br />4"-12" <br />2007 - 2017 <br />El Toro WD <br />Recycled Water Expansion <br />127,700 <br />4"-24" <br />2016 <br />City of Newport Beach <br />Newport Blvd. Water Main Replacement <br />5,300 <br />8"-24" <br />2016 <br />Irvine Ranch Water District <br />Peters Canyon Channel Reuse Pipeline <br />17,000 <br />8"-16" <br />2016 <br />KSD Joint Venture <br />Carlsbad Conveyance <br />50,000 <br />54" <br />2015 <br />City of Glendale Water and <br />Power <br />Bette Davis RW <br />4,000 <br />8" <br />2014 <br />Golden State Water Company <br />Water Main Replacement (5 projects) <br />17,600 <br />6"-12" <br />2013 - 2014 <br />City of Anaheim <br />36" TM Relocation <br />2,000 <br />36" <br />2013 <br />Irvine Ranch Water District <br />Sand Canyon Relocations <br />7,500 <br />8"-24" <br />2010 <br />Moulton Niguel Water District <br />La Paz Road RW Extension <br />4,000 <br />12" <br />2010 <br />Yorba Linda WD <br />Ohio & Oriente Replacement <br />4,000 <br />16" <br />2010 <br />West Basin MWD <br />Mariposa & Campus RW Lateral <br />5,300 <br />6"-8" <br />2009 <br />City of Anaheim <br />TM Santa Ana Canyon TM & Anaheim Hills <br />8,000 <br />30" <br />2008 - 2009 <br />West Basin MWD <br />Honda & Imperial RW Lateral <br />10,200 <br />6" <br />2007 <br />Orange County WD <br />GWR Unit 111 23,000 60"-66" 2006 <br />and Replacement <br />Regional Lift Station Force Main 16,000 24" 2018 - 2020 <br />Replacement <br />Sewer Relining, Rehabilitation <br />Moulton Niguel Water District <br />OCSD <br />Gisler-Redhill <br />3,600 <br />21"-33" <br />2015 <br />OCSD <br />SARI and Yorba Linda Spur <br />25,500 <br />15" & 54" <br />2013 <br />Long Beach WD <br />Orange/Del Amo/15th Street <br />5,200 <br />8"-15" <br />2013 <br />City of Hawthorne <br />Sewer Improvement Project <br />3,700 <br />10" & 12" <br />2009-2013 <br />City of Santa Ana <br />Westminster Avenue & McFadden <br />Sewer <br />4,900 <br />12"-15" <br />2007-2013 <br />Long Beach WD <br />Broadway Phase 3 Relining <br />3,000 <br />14" & 18" <br />2009 <br />City of Buena Park <br />Westminster Ave. and Beach Blvd. <br />Siphon <br />3,000 <br />8" & 15" <br />2008 - 2009 <br />Irvine Ranch Water District <br />Culver and Harvard Rehab <br />10,000 <br />12" & 18" <br />2007 <br />Flow Control Facilities (15 in the last 15 years) <br />City of Santa Ana <br />SA-7 Relocation <br />2019 - 2020 <br />KSD Joint Venture <br />Carlsbad Conveyance FCF <br />2016 <br />City of Santa Ana <br />SA-4 and SA-5 <br />2016 <br />Irvine Ranch Water District <br />Relocation of Zone 1 FCF <br />2012 <br />Orange County WD <br />Kraemer Basin Valve Vault <br />2012 <br />City of Anaheim <br />Sand Canyon PRS <br />2009 <br />City of Santa Ana <br />SA-3 <br />2008 <br />TETRA TECH 25E-24 <br />Page14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.