My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff Experience <br />MNWD On -Call <br />PM <br />QC <br />PE <br />-- <br />DE <br />DE <br />-- <br />-- <br />PE PM <br />DE -- -- PM <br />DE <br />PM PE <br />Carlsbad Conveyance Pipeline <br />QC <br />PM <br />PE <br />DE <br />-- <br />DE <br />-- <br />-- <br />-- — <br />— PM — PM <br />DE <br />PM DE <br />El Toro WD Recycled Water Expansion <br />PM <br />-- <br />PE <br />-- <br />DE <br />DE <br />DE <br />-- <br />DE — <br />-- -- -ii -- <br />-- <br />-- -- <br />IRWD Sand Canyon & IDP Conveyance Pipelines <br />PM <br />— <br />PE <br />— <br />DE <br />— <br />DE <br />PE <br />— — <br />— —1 — — <br />— <br />— — <br />City of Santa Water Mains & SA FCF (5 projects) <br />QC <br />PM <br />PE <br />— <br />-- <br />PE <br />-- <br />— <br />— — <br />— — — — <br />— <br />PM — <br />West Basin MWD On -Call Pipelines (4 projects) <br />QC <br />PM <br />PE <br />DE <br />DE <br />DE <br />DE <br />— <br />— — <br />— — — — <br />— <br />— — <br />City of Anaheim Transmission Mains (3 projects) <br />PM <br />QC <br />-- <br />-- <br />DE <br />DE <br />DE <br />PE <br />-- — <br />— — — — <br />— <br />— — <br />OCWD GWR, Barrier & Replacements (4 projects) <br />PM <br />PM <br />PE <br />— <br />— <br />— <br />DE <br />PE <br />— — <br />— — — PM <br />DE <br />PM PE <br />Yorba Linda Ohio & Oriente Replacement <br />QC <br />PM <br />PE <br />-- <br />DE <br />DE <br />-- <br />— <br />— — <br />— — — — <br />— <br />— — <br />City of Santa Ana Sewers (2 projects) <br />QC <br />PM <br />-- <br />DE <br />-- <br />DE <br />DE <br />— <br />— — <br />— — — — <br />— <br />— — <br />OCSD SARI, Gisler & Warner (3 projects) <br />PM <br />PE <br />PE <br />DE <br />-- <br />DE <br />-- <br />-- <br />— — <br />— — — — <br />— <br />— — <br />Long Beach WD Orange/151h /Broadway (4 projects) <br />PM <br />PM <br />— <br />— <br />— <br />DE <br />DE <br />PE <br />— — <br />— — — — <br />— <br />— <br />IRWD Wells (10 wells) <br />PM <br />-- <br />PE <br />-- <br />DE <br />-- <br />DE <br />PE <br />-- — <br />— — — PM <br />DE <br />PM PE <br />I RWD Pump Stations (5 pump stations) <br />PM <br />PE <br />PE <br />— <br />DE <br />— <br />DE <br />PE <br />DE _ <br />_ _ — PM <br />-- <br />PM -- <br />City of Orange Well 27 and BPS (2 BPS) <br />PM <br />PM <br />PE <br />-- <br />-- <br />-- <br />-- <br />PE <br />DE — <br />— — — PM <br />-- <br />PM PE <br />City of Santa Ana Lift Stations (2 projects) <br />IRWD PDF and IDF Chlorine Mods (2 projects) <br />PM <br />PM <br />PM <br />-- <br />PE <br />-- <br />— <br />-- <br />-- <br />-- <br />DE <br />-- <br />-- <br />-- <br />-- <br />PE <br />-- — <br />-- QC <br />— — PM <br />DE -- -- -- <br />-- <br />-- <br />— — <br />PM <br />City of Paramount Wells Disinfection (3 well sites) <br />PM <br />PE <br />— <br />— <br />— <br />PE <br />DE <br />-- <br />-- QC <br />DE -- -- PM <br />-- <br />PM]__ <br />Anaheim Nohl Tank Disinfection Modifications <br />PM <br />PE <br />-- <br />DE <br />-- <br />— <br />-- <br />-- <br />-- QC <br />-- -- -- -- <br />-- <br />-- — <br />City of Lakewood Treatment Facilities (2 wells) <br />— <br />— <br />— <br />— <br />— <br />— <br />PE <br />— PM <br />DE — — PM <br />DE <br />PM — <br />IRWD Membrane Treatment Facilities (4 projects) <br />— <br />— <br />— <br />DE <br />— <br />— <br />— <br />— <br />— QC <br />DE — — PM <br />DE <br />PM PE <br />City of Ontario Reservoir Seismic Evaluations <br />-- <br />— — c — PM <br />DE <br />— <br />Pico Water District Master Plan and Studies <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />_— <br />— <br />— — PE -- <br />-- <br />-- -- <br />City of Torrance Model Update & Analyses <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />— — <br />— PE -- -- <br />-- <br />— — <br />El Toro WD Customer Retrofits <br />PM <br />— <br />— <br />— <br />DE <br />DE <br />Upper District Customer Retrofits (2 projects) <br />PM <br />— <br />— <br />— <br />DE <br />— <br />— <br />— <br />PE — <br />— — — — <br />— <br />— <br />PD: Project Director; PM: Project/Task Manager, PE: Pmject/Task Engineer; DE: Design Engineer; QC: Quality Control <br />TETRA TECH Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.