My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON -CALL <br />Water Resources Engineering <br />FACILITY PROJECTS <br />The following are three projects that are sample <br />facility projects: <br />Mid -Basin Injection Centennial Park <br />Project (OCWD): These facilities include <br />four (4) submersible backflush pumps and <br />motors within a vault structure. The main <br />relevance is that OCWD was drilling and <br />equipping well facilities within the City of <br />Santa Ana (Centennial Park) and our <br />services included obtaining the necessary <br />City Permits. <br />Elizabeth Reservoir and Booster Pump <br />Station and Water Well No. 29 (City of <br />South Gate): This project included the <br />design of the drilling and equipping of Well <br />No. 29, corresponding disinfection <br />equipment and replacement of several <br />thousand feet of pipe. <br />Well No. 27 Drilling and Equipping (City <br />of Orange): This project included the well <br />drilling and well equipping of a new potable <br />water well, including an electrical and <br />chemical building for sodium hypochlorite <br />treatment. <br />Project Descriptions of these three projects are <br />included in the Appendix. Presented in the table <br />below are the references for these facility <br />projects that we encourage the City to contact <br />relative to our similar experience, development <br />of contract documents, and overall project <br />performance. <br />and Contact <br />Project Name <br />ResponsibleClient <br />Project Team <br />O <br />Orange County Water District <br />Tom Epperson, Mark Bush, Mike <br />Mike Markus, PE <br />Mike Markus, <br />Mid -Basin Injection Centennial <br />Tsoi, Laurence Esguerra, Erin <br />Burris Pump Station <br />Cabanero, Victor Ramirez, Mazen <br />Kassar <br />City of South Gate <br />Tom Epperson, Laurence <br />Kenneth Tang, PE <br />Elizabeth Reservoir and BPS <br />Esguerra, Erin Cabanero, Kyle <br />323/563-9574 <br />and Water Well No. 29 <br />Bohn, Victor Ramirez, Mazen <br />Kassar <br />City of Orange <br />Well No. 27 Demolition, <br />Tom Epperson, Mark Bush, Mike <br />Sonny Tran, PE <br />Drilling and Equipping <br />Tsoi, Laurence Esguerra, Victor <br />714/288-2475 <br />Ramirez, Mazen Kassar <br />TETRA TECH 25E-36 Page 116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.