My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49ot�fg�1�// <br />Mid -Basin Injection Centennial Park Project <br />Fountain Valley, California <br />Client Name: <br />Orange County Water <br />District <br />Year Completed: <br />2017 <br />Reference: <br />Orange County Water <br />District <br />18700 Ward Street <br />Fountain Valley, CA <br />92708 <br />Michael Markus, PE <br />714/378-3305 <br />The Mid -Basin Injection Centennial Park Project is located within Centennial Park in the City of Santa <br />Ana. Four injection wells constructed in below ground vaults are proposed to inject 12 MGD of GWRS <br />water into the principal groundwater aquifer approximately 1,200 feet below ground surface. The <br />project consists of the following: <br />• Four (4) Submersible backflush pumps will be installed within the injection wells with a design <br />flowrate of 3,000 gpm to purge the entire well column and surrounding strata. <br />Each of the four injection wells will require a pipeline connection to deliver the supply water for <br />injection. The source of water for these wells will be the GWRS pipeline located in the western <br />levee of the Santa Ana River. Approximately 5,700 linear feet of supply pipeline will be <br />constructed to injection wells within Centennial Park. The supply pipeline is proposed to be <br />cement mortar coated and epoxy lined steel pipe, and will vary in size from 36-inch, 16-inch, and <br />12-inch. The supply line will cross the Santa Ana River which will require the pipeline to be <br />constructed on the newly expanded Edinger Avenue Bridge. <br />• Approximately 4,200 linear feet of 16-inch backflush pipeline will be constructed within Centennial <br />Road to convey well backflush discharge to the lake or the Greenville -Banning Channel. <br />• A monitoring well is proposed down gradient of the Park's injection wells to monitor the impacts to <br />the groundwater basin. The monitoring well is proposed within the Heritage Museum of Orange <br />County. The area around the monitoring well will be improved and a new irrigation system for the <br />museum farm will be installed. <br />• Two (2) Shared Facilities that will be occupied by OCWD and the City of Santa Ana. <br />TETRA TECH 25E-45 <br />Mid -Basin Injection Centennial Park Project <br />Fountain Valley, California <br />Client Name: <br />Orange County Water <br />District <br />Year Completed: <br />2017 <br />Reference: <br />Orange County Water <br />District <br />18700 Ward Street <br />Fountain Valley, CA <br />92708 <br />Michael Markus, PE <br />714/378-3305 <br />The Mid -Basin Injection Centennial Park Project is located within Centennial Park in the City of Santa <br />Ana. Four injection wells constructed in below ground vaults are proposed to inject 12 MGD of GWRS <br />water into the principal groundwater aquifer approximately 1,200 feet below ground surface. The <br />project consists of the following: <br />• Four (4) Submersible backflush pumps will be installed within the injection wells with a design <br />flowrate of 3,000 gpm to purge the entire well column and surrounding strata. <br />Each of the four injection wells will require a pipeline connection to deliver the supply water for <br />injection. The source of water for these wells will be the GWRS pipeline located in the western <br />levee of the Santa Ana River. Approximately 5,700 linear feet of supply pipeline will be <br />constructed to injection wells within Centennial Park. The supply pipeline is proposed to be <br />cement mortar coated and epoxy lined steel pipe, and will vary in size from 36-inch, 16-inch, and <br />12-inch. The supply line will cross the Santa Ana River which will require the pipeline to be <br />constructed on the newly expanded Edinger Avenue Bridge. <br />• Approximately 4,200 linear feet of 16-inch backflush pipeline will be constructed within Centennial <br />Road to convey well backflush discharge to the lake or the Greenville -Banning Channel. <br />• A monitoring well is proposed down gradient of the Park's injection wells to monitor the impacts to <br />the groundwater basin. The monitoring well is proposed within the Heritage Museum of Orange <br />County. The area around the monitoring well will be improved and a new irrigation system for the <br />museum farm will be installed. <br />• Two (2) Shared Facilities that will be occupied by OCWD and the City of Santa Ana. <br />TETRA TECH 25E-45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.