My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25E - AGMT FOR ON-CALL ENGINEERING SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 2:19:07 PM
Creation date
4/16/2020 2:00:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well 27 Equipping Plan <br />Orange, California <br />Client Name: <br />City of Orange <br />Year Completed: <br />2016 <br />Reference: <br />City of Orange <br />189 S. Water Street <br />Orange, CA 92866 <br />Sonny Tran, PE <br />714/288-2475 <br />Tetra Tech provided engineering design services for the well drilling and well equipping of a potable <br />water well in the City of Orange. This project originally started in 2008 and due to funding shortage the <br />project was stopped in 2010. In 2012, the project resumed design. The project was broken up into <br />three stages: <br />Water Division Warehouse Partial Demolition Plan: The proposed well site is located within an <br />extension of the City of Orange Water Division warehouse. This portion of work included partial <br />demolition of the warehouse, grading and installation of 230 lineal feet of 24-inch storm drain pipeline <br />for the well waste line. <br />Well Drilling Plan: The well drilling plans were for drilling of a 20-inch portable water well to 950 feet <br />below ground surface with a maximum operational rate of 3,000 gallons per minute. The work <br />included destroying the existing Well 14. <br />Well Equipping Plan: The well equipping plans were for the equipping of a 3,000 gallons per minute <br />pump, electrical and chemical building for sodium hypochlorite treatment, emergency generator and <br />acoustical enclosure. <br />TETRA TECH 25E-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.