| 
								    Erin Cabanero, PE 
<br />Design Engineer — Pump/Lift Station Upgrades 
<br />Ms. Cabanero has provided design engineering in various water and 
<br />wastewater projects including domestic and reclaimed water pipelines, 
<br />water main replacements, gravity sewer mains, pump stations, lift 
<br />stations, reinforced concrete reservoirs, steel tank reservoirs, wells, flow 
<br />control facilities, and pressure reducing valve vaults. Ms. Cabanero has 
<br />also assisted our engineering design team with preparation of 
<br />construction plans, specifications, and design calculations. 
<br />EXPERIENCE 
<br />La Mirada Recycled Water Expansion, Central Basin Municipal 
<br />Water District, CA. Present. Design Engineer. The La Mirada Recycled 
<br />Water Expansion Project will provide recycled water to irrigate several 
<br />large landscaped facilities such as La Mirada Golf Course, La Mirada 
<br />Regional Park, Behringer Park as well as schools and several City 
<br />facilities. Forty-nine potential recycled water users were identified with an 
<br />estimated irrigation demand of 930 acre feet per year. 
<br />Education: 
<br />B.S., Civil Engineering, 
<br />University of California, Irvine, 
<br />2009 
<br />Registrations: 
<br />Professional Engineer, 
<br />California, No. C 89704, 2018 
<br />Professional Affiliations: 
<br />American Society of Civil 
<br />Engineers 
<br />Office Location: 
<br />Irvine, CA 
<br />Years of Experience: 
<br />10 
<br />Years with Tetra Tech: 
<br />10 
<br />Pipeline from Baker Pump Station to OC-76, El Toro Water District, CA. Design Engineer. Design of 5,100 
<br />feet of pipeline to minimize the pressure increase within the R-6 Pressure Zone as a result of the Baker Pump 
<br />Station. 
<br />Warner Industrial Park Sewer Replacement, City of Santa Ana, CA. Design Engineer. The project consisted 
<br />of the replacement of approximately 2,000 linear feet of the existing sewer line on Susan Avenue between 
<br />Warner Avenue and Segerstrom Avenue. 
<br />Gisler-Redhill Trunk Improvements, Reach B, Orange County Sanitation District, Tustin, CA. Design 
<br />Engineer for the replacement of 21- and 24-inch sewer mains in the Gisler-Redhill Trunk Improvements, Reach 
<br />B to be replaced with 24- to 36-inch pipelines. The project traverses through the cities of Tustin, Santa Ana and 
<br />Irvine. Scope of services included preliminary design, final design, and construction administration. 
<br />Peters Canyon Channel Water Capture and Reuse Pipeline, Irvine Ranch Water District, Irvine, CA. 
<br />Design Engineer for over 17,000 linear feet of 10-inch to 16-inch steel and PVC pipeline. This was a joint 
<br />project with the City of Irvine, City of Tustin, County of Orange, and Caltrans. Project included three storm drain 
<br />diversion structures and intake design, hanging the pipeline from two bridges, bore and jack under the railroad 
<br />and backpressure vault. 
<br />Newport Boulevard Water Main Rehabilitation, City of Newport Beach, CA. Design Engineer. Provided 
<br />engineering support for the replacement/rehabilitation of the existing 20/16-inch cast iron pipeline constructed in 
<br />the mid-1920s within Newport/Balboa Boulevard from the intersection of Via Oporto and Central Avenue to the 
<br />intersection of Balboa Boulevard and 19th Street. This pipeline is vital as it provides water and fire flow protection 
<br />to the businesses and residents in the Newport Bay and Peninsula area. 
<br />City of Industry Recycled Water System Package 3 Pipeline, Upper San Gabriel Valley Municipal Water 
<br />District, City of Covina, CA. Design Engineer. Provided engineering design and construction support services 
<br />for nearly 20,000 linear feet of PVC recycled water main, ranging in size from 4-inch to 12-inch within the City of 
<br />West Covina and Unincorporated Los Angeles County. Work included preparation of a preliminary design 
<br />report, pipeline alignment study, coordination with regulatory agencies, preparation of technical specifications 
<br />and project contract documents. Advertised project bid and managed bidding process for the Client. Conducted 
<br />Bid opening, reviewed all bids received for completeness and accuracy, conformance with contract 
<br />qualifications and license requirements, and provided recommendation to the Client for award of Contract. 
<br />Performed engineering support services during project construction such as attending construction meetings; 
<br />review of shop drawings for conformance with the project specifications, and verification of product compliance 
<br />with ARRA buy American funding requirement. 
<br />TETRA TECH 25E-57 
<br />
								 |