My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH- RESO ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - PH- RESO ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 3:36:00 PM
Creation date
4/16/2020 3:28:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GPA No. 2020-01 & ZOA No. 2020-02 <br />1109 North Broadway <br />April 21, 2020 <br />Page 2 <br />DISCUSSION <br />Michael Harrah, representing Caribou Industries, is requesting approval of a general plan amendment <br />and zoning ordinance amendment to allow the construction of a mixed -use structure consisting of <br />office, residential, entertainment and retail uses at 1109 North Broadway. Specifically, the changes <br />to the general plan and zoning will allow residential uses within the entitled office structure. If <br />approved, the project will contain no less than 200,000 square feet of office and commercial space <br />and a maximum of 415 residential apartment units encompassing about 318,000 square feet of floor <br />area. <br />In 2004, Caribou Industries received entitlements for a 37-story, 493-foot-tall office tower consisting <br />of 518,003 square feet of floor area. The project included 490,003 square feet of office space, <br />10,000 square feet of retail space and 18,000 square feet of restaurant dining area. Due to <br />numerous economic considerations, the applicant was unable to move forward with the construction <br />of the office tower. In conjunction with the approval of the original project, the City Council also <br />approved a development agreement between the City and the Applicant to facilitate the development <br />of the project. However, all the terms of the development agreement are no longer applicable to the <br />project as the agreement expired in 2012 and was never extended. The Applicant is entitled to build <br />out the Project that was previously approved and as stipulate in the existing SD-75. <br />The applicant is now proposing to amend the SD-75 zoning document and the general plan list of <br />allowable uses for the property to include residential uses at the site and to allow up to 415 residential <br />units within approximately 19 floors of the building. The remaining space and stories will be used as <br />office space, commercial and restaurant areas, and residential amenities. Other than the proposed <br />changes described above, the original approval remains in place and will carry through for this <br />revised project. <br />Of the development's maximum 415 units, no more than 80 percent will be devoted to studios and <br />one -bedroom units, with 20 percent dedicated to the larger two and three -bedroom units. Units will <br />range in average sizes from 500 square feet for the studio units up to approximately 1,258 square <br />feet for the three -bedroom units. The project will incorporate several different floor plans that will be <br />finalized once a residential partner is secured. <br />A nine -level freestanding parking structure (one sublevel and eight levels above ground) with a <br />height of 78 feet was approved in 2004 with the original project entitlements. A total of 2,463 parking <br />spaces are proposed within this structure. Approximately 3,200 square feet of retail/restaurant <br />space will be provided on the ground level of the structure. The design of the structure will <br />complement the proposed office tower, with the elevator bank incorporating the same glass that will <br />be used on the tower. The overall parking proposed for the project will accommodate a minimum <br />of 2 parking spaces for each residential unit, plus guest parking. Residential parking will be located <br />behind security gates on the upper levels of the parking structure. After taking in the requirement <br />for office and restaurant parking, a surplus of almost 400 parking spaces will be available. <br />The One Broadway Plaza development project, which was previously approved by the City Council <br />and affirmed by Santa Ana voters via a 2005 referendum, will enhance and provide a positive <br />75A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.