My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaIEEMod Version: CalEEMod.2016.3.2 Page 7 of 17 <br />One Broadway Plaza (Proposed Project) - Orange County, Summer <br />Date: 4/16/2020 1:19 PM <br />ROG <br />NOx <br />CO <br />S02 <br />Fugitive <br />Exhaust <br />PM10 <br />Fugitive <br />Exhaust <br />PM2.5 <br />Bio- CO2 <br />NBio-0O2 <br />Total CO2 <br />CH4 <br />N20 <br />CO2e <br />PM10 <br />PM10 <br />Total <br />PM2.5 <br />PM2.5 <br />Total <br />Percent <br />85.35 <br />36.20 <br />71.41 <br />75.37 <br />31.40 <br />98.13 <br />71.23 <br />31.40 <br />98.17 <br />87.95 <br />100.00 <br />40.87 <br />46.44 <br />92.50 <br />79.62 <br />46.88 <br />Reduction <br />3.0 Construction Detail <br />Construction Phase <br />Phase <br />Number <br />Phase Name <br />Phase Type <br />Start Date <br />End Date <br />Num Days <br />Week <br />Num Days <br />Phase Description <br />1 •Demolition •Demolition :1/28/2020 2/24/2020 5: 20- <br />Acres of Grading (Site Preparation Phase): 0 <br />Acres of Grading (Grading Phase): 0 <br />Acres of Paving: 0 <br />Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural <br />Coating — sgft) <br />OffRoad Equipment <br />Phase Name I Offroad Equipment Type I Amount I Usage Hours I Horse Power I Load Factor <br />Demolition <br />'Concrete/Industrial Saws <br />; 0; <br />i <br />8.00i 81 : 0.73 <br />�- - - - - <br />i <br />-------------------------------------- <br />Demolition <br />+Excavators <br />; 0 <br />8.001 158, 0.38 <br />---------------------------- <br />--------------------------*------------------------------r------------- <br />------------- <br />Demolition <br />•Rubber Tired Dozers <br />0 <br />8.00: 247: 0.40 <br />Trips and VMT <br />Phase Name <br />Offroad Equipment <br />Count <br />Worker Trip <br />Number <br />Vendor Trip <br />Number <br />I Hauling Trip <br />Number <br />I Worker Trip <br />Length <br />Vendor Trip <br />Length <br />Hauling Trip <br />Length <br />I Worker Vehicle <br />Class <br />Vendor <br />Vehicle Class <br />Hauling <br />Vehicle Class <br />Demolition 0. 0.00, 0.00, 0.00, 14.70, 6.90, 20.00,LD Mix HDT Mix HHDT <br />
The URL can be used to link to this page
Your browser does not support the video tag.