My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />2. Environmental Setting <br />2.2.2 Surrounding Land Use and Zoning <br />The Project Site is located on one City block that is surrounded by the parcels zoned Midtown Specific Plan <br />(SP 3). The Midtown Specific Plan area is roughly bound by 17th Street to the north, Civic Center Drive to the <br />south, mid -block between Bush Street and Spurgeon Street to the east, and midblock between Broadway and <br />Durant Street to the west. General Plan land uses that make up the Midtown Specific Plan include: General <br />Commercial (GC), Professional & Administration Office (PAO), and District Center (DC). The Midtown <br />Specific Plan area is developed with a range of commercial uses, educational facilities, multi -family residential, <br />single-family residential, and Orange County services. <br />Outside the Midtown Specific Plan area and surrounding the Project Site, Two -Family Residence (R2), Multiple - <br />Family Residence (R3), Professional (P), and Open Space (0) land use designations are located to the west of <br />the Project Site; Community Commercial (Cl) and Arterial Commercial land use designations are located along <br />17th Street to the north; Multiple -Family Residence (R3) and French Park Historical District (Specific <br />Development No. 19) are located to the east; and the Transit Zoning Code (Specific Development No. 84) is <br />located to the south. <br />The Midtown Specific Plan parcels that surround the Project Site have a land use designation of Professional <br />& Administration Office (PAO) to the north, east and west; District Center (DC) to the south; and General <br />Commercial (GC) to the northeast. A two-story multi -family residential building and a surface parking lot is <br />located to the north of the Project Site, across 10th Street. Orange County services and the Orange County <br />School of the Arts is located to the east of the Project Site, across Sycamore Street. A surface parking lot is <br />located to the south of the Project Site, across W. Washington Avenue. Commercial uses and multi -family <br />residential uses are located across Broadway to the west of the Project Site. <br />2.2.3 Local and Regional Access <br />Access to the Project Site is provided by the surrounding street grid system. Direct access to the Project Site is <br />provide from Broadway (on the western side of the Project Site), Washington Avenue (on the northern side of <br />the Project Site), and Sycamore Street on the eastern side of the Project Site. The Santa Ana Freeway (I-5 <br />Freeway) provides regional access to the Project Site and is located approximately 0.5 miles east of the Project <br />Site. <br />2.2.4 Public Transit <br />Consistent with statewide mandates (see AB 32, SB 375, SB 743) and SCAG's 2016-2040 RTP/SCS to place <br />increased density near major transportation and employment centers, the Proposed Project would introduce a <br />residential use within an approved office tower, which would provide for a mixed -use project. The Proposed <br />Project would place residents in the immediate vicinity of governmental offices, professional offices, shops and <br />services, restaurants; and would be within walking distance to public transit opportunities. Bus routes serving <br />the project area include OCTA routes 53/53X, 55, 60, 83,150, 560, and 862. These routes provide connections <br />to several areas countywide. In addition, the Project Site is about 0.7 miles west from the Santa Ana Regional <br />Transportation Station, which is served by regional trains including Amtrak and Metrolink, and bus lines such <br />Apri12020 Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.