Laserfiche WebLink
5. Environmental Analysis <br />This section provides evidence that no new significant impacts would occur as a result of either a change to <br />the project or a change in circumstances. In accordance with Section 21166 of CEQA and 15162 of the CEQA <br />Guidelines, and relevant case law, the baseline for this determination is the Approved Project. The section will <br />briefly summarize the conclusions of the 2004 Certified EIR and then discuss whether or not the Proposed <br />Project is consistent with the findings in that document. Applicable mitigation measures are referenced from <br />the 2004 Certified EIR, are also provided in each section. <br />As discussed previously, this document is an addendum to the 2004 Certified EIR. The Proposed Project is <br />located in the One Broadway Plaza Specific Development Zoning District with a corresponding General Plan <br />land use designation of One Broadway Plaza District Center. <br />The mitigation program identified to reduce potential impacts of the Proposed Project consists of Standard <br />Requirements (SRs) and mitigation measures (MMs). The components of the mitigation program are described <br />below. <br />Standard Requirements. Existing SRs are based on local, state, or federal regulations or laws that are <br />frequently required independently of CEQA review and also serve to offset or prevent specific impacts. <br />Typical SRs include compliance with the provisions of the California and local building codes, South Coast <br />Air Quality Management District rules, City ordinances, and local agency impact fees, among others. <br />Mitigation Measures. Where a potentially significant environmental effect has been identified and is not <br />reduced to a level considered less than significant through the application of SRs, mitigation measures have <br />been provided. All applicable measures have been carried through from the One Broadway Plaza EIR. <br />These mitigation measures have been incorporated into the MMRP for this Addendum. Any modifications <br />to the mitigation measures from the Certified EIR are shown as for deleted text and bold <br />for new, inserted text. <br />The City may substitute, at its discretion, any mitigation measure (and timing thereof) that has: (1) The same or <br />superior result as the original mitigation measure and (2) the same or superior effect on the environment. The <br />City of Santa Ana Planning and Building Agency, Planning Division, in conjunction with any appropriate <br />agencies or City departments, shall determine the adequacy of any proposed "environmental equivalent timing" <br />and, if deemed necessary, may refer said determination to the Planning Commission. <br />Apri12020 Page 23 <br />