My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />AQ-2 Water site and clean equipment morning and evening to comply with AQMD Fugitive Dust <br />Measures BCM-03 and BCM-06. As part of the conditions of grading permit approval, the <br />project shall water the construction site and unpaved haul roads (with use of reclaimed water <br />or chemical soil binder, where feasible) twice daily. <br />AQ-3 Wash off trucks leaving the site to comply with AQMD Fugitive Dust Measure BCM-01. As <br />part of the conditions of grading permit approval, project construction contractors shall <br />wheel wash construction equipment and cover dirt in trucks during on -road hauling. This <br />is already ineluded in the partietdate emi E)fts in the rep Haul trucks <br />leaving the site shall also have a minimum freeboard distance of 12", or cover payloads. <br />AQ-4 Sweep streets if silt is carried over to adjacent public thoroughfares. <br />AQ-5 Reduce traffic speeds on all unpaved road surfaces to 15 miles per hour or less. <br />AQ-6 Suspend grading operations during first and second stage smog alerts. <br />AQ-7 Suspend all grading operations when wind speeds (as instantaneous gusts) exceed 25 miles per <br />hour. <br />AQ-8 Maintain construction equipment engines by keeping them tuned. <br />AQ-9 Where feasible use low sulfur fuel for stationary construction equipment. <br />AQ-10 Where feasible utilize existing power sources (e.g., power poles) or clean fuel generators rather <br />than temporary power generators. <br />AQ-11 Provide on -site power sources during the early stages of the project. <br />AQ-12 Where feasible use low emission on -site stationary equipment (e.g. clean fuels). <br />AQ-13 Spread soil binders on site, unpaved roads and parking areas. <br />AQ-14 Apply chemical soil stabilizers according to manufacturer's specifications to all inactive <br />construction areas (previously graded areas which remain inactive for 96 hours). <br />AQ-15 Reestablish groundcovers on construction site through seeding and watering of the site that <br />will not be disturbed for lengthy periods (such as two months or more). <br />AQ-16 Schedule truck deliveries and pickups during off-peak hour. <br />AQ-17 Provide adequate ingress and egress at all entrances to public facilities to minimize vehicle <br />idling at curbsides. <br />AQ-18 Provide dedicated turn lanes as appropriate and provide roadway improvements at heavily <br />congested roadways. <br />Apri12020 Page 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.