My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />would be less than significant and no change or new information would require preparation of a subsequent <br />EIR. <br />5.6.3 Adopted Mitigation Measures Applicable to the Proposed Project <br />No mitigation measures related to energy are applicable to the Proposed Project. <br />5.7 GEOLOGY AND SOILS <br />5.7.1 Summary of Previous Environmental Analysis <br />The Certified EIR found that the development of the Approved Project would change the topography of the <br />site; however, this would not result in a significant impact since the change would be covered by buildings <br />constructed on the site. The soils on the site are classified as a single soil association and are relatively uniform <br />in composition of Mocho association, including loam, clay loam, and similar soil types. Geotechnical testing <br />indicated that the soils have low expansivity and mostly overconsolidated. The soils on the Project Site were <br />determined to be adequate for building and do not pose a constraint for the land uses proposed as part of the <br />Approved Project. The Certified EIR found that the Approved Project would impact existing topography and <br />soils at the Project Site and incorporates mitigation measures to ensure that impacts are less than significant. <br />The Approved Project does not include septic tanks; and no further discussion was required. <br />The Certified EIR determined that a less than significant impact would occur with regards to groundshaking, <br />liquefaction, and surface fault rupture. The Certified EIR identifies a mitigation measure to ensure that the <br />Approved Project would comply with the seismic design provisions of the Final Geology and Soils Report and <br />the Uniform Building Code to promote safety in the event of an earthquake. The Initial Study analyzed <br />landslides and determined that the Project Site and surrounding areas are relatively flat and developed. <br />Construction of the Approved Project would create dust, which would be reduced to a less than significant <br />level with the incorporation of a mitigation measure in place to control dust. <br />Paleontological resources were analyzed as part of the Cultural Resources section in the Initial Study prepared <br />for the Approved Project. The Initial Study determined that the Approved Project's impact to paleontological <br />resources and unique geologic features would be less than significant as the Project Site is currently developed <br />and no prior discoveries of paleontological resources have occurred. <br />5.7.2 Impacts Associated with the Proposed Project <br />Would the Proposed Project: <br />April2o2o <br />Page 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.