My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />1. Introduction <br />e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section <br />15162 should be included in an addendum to an EIR, the lead agency's findings on the <br />project, or elsewhere in the record. The explanation must be supported by substantial <br />evidence. <br />After careful consideration of the potential environmental impacts of the Proposed Project, the City of Santa <br />Ana has determined that 1) none of the conditions requiring preparation of a subsequent or supplement to an <br />EIR have occurred, and 2) the circumstances described in Section 15164 of the CEQA Guidelines exist. <br />Therefore, an Addendum to the One Broadway Plaza EIR has been deemed appropriate. <br />1.1.2 Scope of Analysis in This Addendum <br />Changes to the One Broadway Plaza EIR ("Certified EIR") and regulatory conditions, described below under <br />the Project Description would fulfill none of the conditions outlined in CEQA Guidelines Sections <br />15162(a)(1)—(3) as these changes would not result in new significant environmental effects or a substantial <br />increase in the severity of previously identified significant effects requiring major revisions to the 2004 Certified <br />EIR. Accordingly, this checklist provides the substantial evidence required by CEQA Guidelines Section <br />15164(e) to support the finding that a subsequent EIR is not required and an addendum to the 2004 Certified <br />EIR is the appropriate environmental document to address changes to the project. <br />In order to implement the Proposed Project, a number of discretionary approvals from the City of Santa Ana <br />are required, including a General Plan Amendment and a Zoning Ordinance Amendment to the One Broadway <br />Plaza Specific Development District (SD 75). As lead agency under CEQA, the City of Santa Ana is required <br />to evaluate the environmental impacts associated with these discretionary approvals. The scope of the review <br />for project -related impacts for this Addendum is limited to differences between impacts analyzed by the <br />Certified EIR for implementation of the One Broadway Plaza Project (Approved Project) and the Proposed <br />Project. The Approved Project will serve as the "baseline" for the environmental impact analysis. The baseline <br />includes all applicable mitigation measures from the adopted Mitigation Monitoring and Reporting Program <br />(MMRP), approved in conjunction with the Certified EIR. As required by CEQA, this Addendum also <br />addresses changes in circumstances or new information that would potentially involve new environmental <br />impacts. <br />1.2 CONTENT AND ORGANIZATION OF THIS ADDENDUM <br />This Addendum relies on the City of Santa Ana's CEQA checklist, which addresses environmental issues <br />section by section. The completed checklist is included in Section 5.0, Environmental Analysis. Each <br />environmental topic has the following subheadings: <br />Summary of Previous Environmental Analysis (including the One Broadway Plaza EIR, and previous <br />CEQA documentation; see description under Subsection 3.1, Project Background, of this Addendum) <br />■ Impacts Associated with the Proposed Project (including environmental checklist) <br />■ Adopted Mitigation Measures Applicable to the Proposed Project <br />Apri12020 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.