My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous <br />intersections) or incompatible uses (e.g., farm equipment)? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />The Proposed Project would place multi -family residential units within an urbanized area where multi -family <br />residential units already exist. Therefore, the Proposed Project would not introduce incompatible uses. The <br />Proposed Project would not alter access to the Project Site nor introduce new geometric design features beyond <br />what was analyzed in the Certified EIR. The Proposed Project would adhere to all identified mitigation <br />measures identified in the Certified EIR, which would ensure that impacts regarding geometric design feature <br />are less than significant. Therefore, no significant new impact or substantial increase in the severity of a <br />previously described impact would occur, and the preparation of a subsequent EIR would not be required. <br />d) Result in inadequate emergency access? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />The Approved Project incorporates two access points to the approved eight -level parking garage. As part of <br />the development of the Approved Project, the Approved Project incorporates street improvements, such as <br />the installation of a roundabout at the intersection of Sycamore Street and 10th Street and other roadway <br />modifications. The Certified EIR determined that the Approved Project's impact to surface transportation <br />routes adjacent to or in the vicinity of the Project Site would be less than significant with the incorporation of <br />mitigation measures. The Proposed Project does not include any roadway modifications and as shown in Table <br />12, the Proposed Project would result in a reduction of project trips. Therefore, the Proposed Project would <br />not create significant new impact or substantial increase in the severity of a previously described impact, and <br />the preparation of a subsequent EIR would not be required. <br />5.17.3 Adopted Mitigation Measures Applicable to the Proposed Project <br />The following mitigation measures have been carried through from the One Broadway Plaza EIR. These <br />mitigation measures have been incorporated into Mitigation Monitoring Plan for this Addendum. Any <br />modifications to the mitigation measures from the Certified EIR are shown as strikegifetigh for deleted text <br />and bold for new, inserted text. <br />T-1 The developer shall pay all costs (design, construction, administration and inspection) for <br />Washington Avenue and 10th Street to operate as one-way streets which include signal <br />modifications and appropriate protected left -turn signal at Main Street/Washington Avenue, <br />Main Street/10th Street, Washington Avenue/Sycamore Street, Broadway Street/Washington <br />Avenue and Broadway Street/10th Street. <br />T-2 The project proponent shall pay for all costs for the installation of a roundabout at the <br />intersection of Sycamore Street and 10th Street. <br />T-3 The project proponent shall pay all costs to install pedestrian crosswalks and a refuge area at <br />the intersection of Sycamore Street and 10th Street where a roundabout is to be constructed. <br />The project developer shall be required to pay all costs (design, construction, administration <br />Page 86 PlaceWorks <br />
The URL can be used to link to this page
Your browser does not support the video tag.