Laserfiche WebLink
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />The Approved Project would comply with federal, state and local statutes and regulations for solid waste, <br />including the City's recycling program. The project contractor would be required to recycle demolition and <br />construction debris. The Approved Project was found to result in no impact. <br />5.19.2 Impacts Associated with the Proposed Project <br />Would the Proposed Project: <br />Less Than <br />Significant <br />Substantial <br />Impact/No <br />Substantial <br />Change in <br />New <br />Changes or <br />Change in <br />Circum- <br />Information <br />New <br />Project <br />stances <br />Showing New <br />Information <br />Requiring <br />Requiring <br />or Increased <br />Requiring <br />Major EIR <br />Major EIR <br />Significant <br />Preparation of <br />Environmental Issues <br />Revisions <br />Revisions <br />Effects <br />an EIR <br />No Impact <br />a) Require or result in the relocation or <br />construction of new or expanded water, <br />wastewater treatment or storm water <br />drainage, electric power, natural gas, or <br />X <br />telecommunications facilities, the <br />construction or relocation of which could <br />cause significant environmental effects? <br />b) Have sufficient water supplies available to <br />serve the project from existing entitlements <br />and resources or are new or expanded <br />X <br />entitlements needed? <br />c) Result in a determination by the wastewater <br />treatment provider which serves or may <br />serve the project that it has adequate <br />capacity to serve the project's projected <br />X <br />demand in addition to the provider's existing <br />commitments? <br />d) Generate solid waste in excess of State or <br />local standards, or in excess of the capacity <br />of local infrastructure, or otherwise impair <br />X <br />the attainment of solid waste reduction <br />goals? <br />e) Comply with federal, state, and local <br />management and reduction statutes and <br />X <br />regulations related to solid waste? <br />This section is partially based on the report prepared by DMc Engineering on March 3, 2020, titled Water and <br />Sewer Coparison for the One Broadway Plara ("Water and Sewer Study"). The Water and Sewer Study is contained <br />in Appendix C. <br />Page 92 PlaceWorks <br />