Laserfiche WebLink
I. C'I'I'IilS I"NUI\F)-,,RING 1NC. <br />8. City of Downey <br />Project Name: Civic Center Drive and Nall Road Water System improvement Project <br />Value $400,000 <br />Description: Installation of new main, fire hydrant assemblies, water service lines, meter and <br />boxes; installation of gate valves, tees, bends, thrust blocks, and fittings; abandoning of existing <br />water mains and service lines. <br />Contact;Lorena Powell (562) 302-38655 <br />9. City of Norco <br />Project Name: Norco MDp Line ND Extension Storm Drain Project <br />Value; $400,000 <br />Description: Installation of RCP 18' and24" catch basins, manholes, junction structures, local <br />depression, cold mill, and related work. <br />Contact: Dan Cuthbertson (951) 545.7872 <br />10. City of Oceanside <br />Project Name: Vista Way/El Camino Real Sewer Relocation <br />Value: $15Q,000 <br />Description: Abandon existing 6" pipe and construct 8" SDR 26 PVC pipe, install new concrete <br />manhole, modification & rehabilitation of existing manholes, sewer bypass pumping, and <br />maintain/replace traffic loops, <br />Contact $hukriSharabi(760)717-6161 <br />11. City of Costa Mesa <br />Project Name: North Del Mar Storm Drain Repair <br />Value: $72,500 <br />Description: Remove existing 24" corrugated metal pipe and install 24" with sack I slurry, <br />construct newjunction structure and manhole, connect 24" RCP storm drain to existing CMP <br />storm drain and pave trench.' <br />Contact: Kelly Dalton (714) 466-0360 <br />