My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA FOR HAZARD BIKE LANES PR NO. 18-6903
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
05/05/2020
>
20B - AA FOR HAZARD BIKE LANES PR NO. 18-6903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2020 1:42:06 PM
Creation date
4/30/2020 1:04:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
5/5/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Loops Crackfilling, Inc. <br />946 S. Emerald Street, Anaheim CA 92904 • Tel: (714) 520 4026 Fax: (714) 520 4027 <br />General Terms and Conditions: <br />-Quote is valid for 180 days from the date of this proposal. <br />-In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail.® <br />-10 days notice required for scheduling. <br />•24 hours notice required for rescheduling. <br />-Site must be ready with cat -track, permanent striping, grinding, asphalt, approvals, etc. prior to loop installation. <br />-Access to the job site must be furnished by Contractor, the general contractor, lessee or other party ordering work. <br />-Additional charges may incur for the following: <br />a) Site is not ready (for TLC's scope of work) the day of scheduled work or delays <br />b) Extra move -ins <br />c) When minimum move -in requirements are not met (if noted in quote) <br />-All changes to the original scope of work or proposed extra work must be directed by the Contractor in writing prior to Traffic Loop Crackfilling, Inc. (TLC) before <br />performing this work. No extra work or additional work will be performed without written authorization. <br />-This quote will not be valid if there are any changes or deletions of any item post bid and will need revised pricing. <br />-Total bid must be accepted (must use all line items) unless otherwise noted or agreed to. If you need revised pricing for only a portion of the work, contact Estimator. <br />-TLC will not be impacted by Liquidated Damages assessed by the Contractor / Agency due to an inadequate amount of time to complete TLC operations. <br />-Contractorto provide monthly progress payments for all completed work in accordance with the bid pricing schedule. Monthly payments must be received in full by <br />TLC no later than 10 calendar days after the Contractor receives payment from Owner for our completed work. <br />-Retention % is to be withheld only as per the Owner's requirements. <br />-Contractor hereby agrees that time shall be of the essence In regard to all payments provided for herein, and if any payment is not made when due, Contractor <br />agrees to pay all collection costs and expenses including costs of suit and any related attorney's fees and costs and also hereby waives the benefit of any statute of <br />limitation that would prohibit an action of TLC to enforce the terms and conditions of this Contract including but not limited to any right to <br />recovery of attorneys fees and costs. The laws of the State of California shall control all aspects of this contract except as to lien matters, which will be governed by <br />the laws of the state where the subject property is located. <br />-TLC requires a written contract, purchase order or signed quote prior to the start of work. <br />-The language and terms used in this exhibit supersede any conflicting terms in the Subcontract Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.