Laserfiche WebLink
City of Santa Ana <br />Page 3 <br />Hazard <br />Avenue Protected Bike Lanes (18-6903 (CML 5063(182))), bidding on <br />February 26, <br />2020 2:00 PM (Pacific) <br />Printed o3/25/2020 <br />Bid Results <br />Type <br />Item Code UOM <br />Qty <br />Unit Price <br />Line Total Comment <br />20 <br />Furnish and Install Raised Curb Median Island Treatment (per plan <br />Detail "L") <br />EA <br />4 <br />$1,000.00 <br />$4,000.00 <br />21 <br />12" White Thermoplastic Crosswalk Line, I V O.C. (Thermoplastic) <br />SF <br />1370 <br />$4.50 <br />$6,165.00 <br />22 <br />Furnish and Install New Sign and Pole <br />EA <br />27 <br />$350.00 <br />$9,450.00 <br />23 <br />Furnish and Install New Sign(s), only <br />EA <br />26 <br />$255.00 <br />$6,630.00 <br />24 <br />Furnish and Install New Sign(s), hack -to -hack, only <br />EA <br />17 <br />$255.00 <br />$4,335.00 <br />25 <br />Remove existing sign(s), only <br />EA <br />12 <br />$16.00 <br />$192.00 <br />26 <br />Remove existing sign(s) and Pole <br />EA <br />13 <br />$30.00 <br />$390.00 <br />27 <br />Cement Median Island (8" height Including Dowels) <br />CY <br />482 <br />$1,185.00 <br />$571,170.00 <br />28 <br />Traffic Control <br />LS <br />1 <br />$50,000.00 <br />$50,000.00 <br />29 <br />SWPPP NO. 1 <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />30 <br />Labor Agreement Oversight <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />Subtotal <br />$882,919.00 <br />Total <br />$882,919.00 <br />