My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA AND AGMT WITH OCTA FOR SR-55 (2)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
05/05/2020
>
20A - AA AND AGMT WITH OCTA FOR SR-55 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2020 1:41:19 PM
Creation date
4/30/2020 1:17:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
5/5/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-0-2201 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />ARTICLE 3. RESPONSIBILITIES OF AUTHORITY <br />AUTHORITY agrees to the following responsibilities for PROJECT: <br />A. To be the sponsor and funding agency, and to manage and administer the PS&E contract <br />for PROJECT. <br />B. To perform right-of-way acquisition and right-of-way certification for PROJECT. <br />C. To require Caltrans' contractor (hereinafter referred to as "CONTRACTOR') to obtain a <br />no -fee encroachment permit from CITY prior to commencing construction of PROJECT. Provided all <br />conditions of such permit have been fulfilled, the permits shall authorize CONTRACTOR to commence <br />work within CITY right-of-way, or areas which affect CITY facilities. <br />D. To implement a public awareness campaign during PROJECT that advises CITY, local <br />businesses, residents, elected officials, motorists, and media, of construction status, street detours, and <br />ramp and freeway closures, if and where applicable. <br />E. To acquire a portion of CITY -owned property currently utilized by the CITY's PRS and <br />acquire temporary property rights to perform construction activities in connection with PROJECT. <br />Acquisition of property rights for both permanent and temporary use by AUTHORITY shall be addressed <br />through a property acquisition agreement and performed in accordance with federal and state acquisition <br />requirements. <br />F. To acquire a portion of the adjacent privately -owned property and acquire temporary <br />property rights to perform construction activities to accommodate the relocation of the CITY's PRS. The <br />property acquisition costs for a portion of the adjacent property shall be deemed a PROJECT cost and <br />not the responsibility of CITY. <br />G. To acquire permanent utility easement rights on privately -owned property located on the <br />eastern side of the SR-55 and to acquire temporary property rights to perform construction activities to <br />accommodate for the relocation of the CITY -owned utilities related to the PRS. The acquisition costs of <br />the permanent easement and temporary construction rights shall be deemed a PROJECT cost and not <br />the responsibility of CITY. <br />29of13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.