My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFRASTRUCTURE ENGINEERING CORPORATION (IEC)-A-2017-265-18
Clerk
>
Contracts / Agreements
>
I
>
INFRASTRUCTURE ENGINEERING CORPORATION (IEC)-A-2017-265-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:53:55 AM
Creation date
4/30/2020 3:31:09 PM
Metadata
Fields
Template:
Contracts
Company Name
INFRASTRUCTURE ENGINEERING CORPORATION (IEC)
Contract #
A-2017-265-18
Agency
PLANNING & BUILDING
Council Approval Date
10/3/2017
Expiration Date
10/2/2020
Insurance Exp Date
1/1/1900
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 <br />HOURLY CHARGE RATE & EXPENSE REIMBURSEMENT SCHEDULE <br />Engineering Intern/Technician ...........................$ <br />CADD Designer I/Engineer I ............. ................. $ <br />CADD Designer II/Engineer II ........ .................... $ <br />CADD Designer III/Engineer ill ..........................$ <br />Project Designer .................... ...................... ..... $ <br />Senior Designer/Project Engineer .....................$ <br />Senior Project Engineer .....................................$ <br />SeniorProjectEngineer—Planning& IS ..............$ <br />Project Manager ........ ..................................... ...$ <br />Senior Project Manager ............................. ....... $ <br />Principal- ................ ........................................ $ <br />80 <br />Internlrechnician............................................ <br />..$ <br />80 <br />130 <br />Technical Editor ................................... ........... <br />..$ <br />110 <br />145 <br />Env Specialist I/Project Coordinator I ................$ <br />120 <br />155 <br />Graphic Artist— . ....... .......................... ............... <br />$ <br />120 <br />160 <br />Lead Technical Editor............. ........................... <br />$ <br />130 <br />170 <br />Env Specialistll/Project Coordinator I I ...............$ <br />145 <br />185 <br />Env Specialist III/Project Coordinator III ........... <br />$ <br />155 <br />200 <br />Project Manager ..............................................$ <br />210 <br />220 <br />Senior Project Manger ......... ......... ................... <br />$ <br />235 <br />235 <br />Principal .............................. .............................. <br />$ <br />250 <br />250 <br />SURVEYING <br />Survey Assistant I .......... ..................... — ........... <br />$ <br />125 <br />Project Surveyor. .............................................. <br />$ <br />145 <br />Principal Surveyor .................................. ........... <br />$ <br />170 <br />Field-1 Person* .......................................... <br />..... $ <br />170 <br />Field —2Person Crew' ............................... ....... <br />$ <br />260 <br />*CONSTRUCTION <br />Assistant CM Coordinator, .................... ........... <br />$ <br />100 <br />CM Coordinator ........................................... <br />..... $ <br />120 <br />Senior Construction Inspector ...........................$ <br />150 <br />Resident Engineer ..... ....................................... <br />$ <br />160 <br />Construction Manager ................... .................. <br />$ <br />200 <br />Sr. Construction Manager .................................$ <br />210 <br />PROGRAM MANAGEMENT <br />Assistant Program Manager ..............................$ 155 <br />Program Manager .............................. ............... $ 185 <br />Principal............... ..... .................... ............. ...... $ 250 <br />FLOW MONITORING <br />Field Technician I ........ ...................................... $ 80 <br />Field Technician II ..................... ........................ $ 100 <br />Field Technician III ..... ............................. .......... $ 110 <br />Field Supervisor ................................................$ 125 <br />Field Operations Manager........ ................. ....... $ 160 <br />ProjectlData Manager ............... ........................ $ 180 <br />ADMINISTRATIVE <br />Word Processor/Administrative Support ........... $ 100 <br />Subconsultants will be billed at cost plus 10%unless specified otherwise in the agreement. <br />All base rates will escalate by 3% per annum. <br />' Field personnel rates are inclusive of vehicle, mileage, phone, computer, survey equipment, etc. Inspection rates shown are for prevailing <br />wage projects. Inspection rates for overtime are $30 dollars an hour more than the listed rate. <br />Reimbursable Costs <br />Reproduction, special photography, postage, delivery services, express mail, printing, travel, parking, and any other specialty services <br />performed by subcontractor will be billed at cost plus 15%. <br />Mileage will be billed at the current IRS allowed rate. <br />City of Santa Ana <br />Statement of Qualifications for Environmental and Planning Services (RPQ p17-043) <br />16 <br />IEf <br />
The URL can be used to link to this page
Your browser does not support the video tag.