My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-05-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
05/05/2020
>
FULL PACKET_2020-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2020 5:34:17 PM
Creation date
4/30/2020 3:55:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/5/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1037
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />City of Santa Ana <br />Section 3 New Hire Calculation Form <br />Project Name: Local Street Curb Ramp Improvements (Phase II) <br />Project Location: Various locations in the city of Santa Ana <br />Street City State Zip <br />Contractor Name: Vldo Samarzich, Inc. <br />Contractor Contact: Vldo Samarzich <br />Contractor Telephone Number: (909) 987-6377 <br />Contractor Email Address:vidosam@yahoo.com <br />Section 3 Resident Hiring Goals 1 <br />Trade/Craft I Number of New Hires <br />WA <br />Total Number of New Hires: 0 1 <br />Total number of Section 3 resident new hires necessary to comply with contract: <br />-4/ J03/27/2020 <br />SignatureofC tr ctor Date <br />0 <br />23A-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.