Laserfiche WebLink
REQUEST FOR PROPOSAL <br />r On -Call Water Resources Engineering Services <br />(RFP NO.19-100) __� tl. <br />>f <br />schedules through our deep bench of resources. A listing of our on -call contracts is included on the <br />previous page. <br />Michael Baker continuously supports our local water agencies by providing pipeline alternative alignment <br />and facility siting studies, as well as Water / Recycled Water / Sewer System planning and feasibility <br />studies, hydraulic modeling services and system wide condition assessments. We are currently under a <br />specific contract with Mesa Water District for maintaining and utilizing their hydraulic model for various <br />studies. We also routinely provide design for new and rehabilitation or replacement of existing water <br />facilities, infrastructure, and distribution pipelines. <br />Michael Baker has delivered services for pipeline projects that include steel pipe, ductile iron pipe, high - <br />density polyethylene (HDPE) pipe, and polyvinyl chloride (PVC) pipe, ranging in size from 8- to 114-inches <br />in diameter. Our engineers are skilled in the traditional aspects of pipeline design such as alternative <br />alignment analysis, materials selection, hydraulic and transient analysis, hydraulic modeling, and cost <br />estimates, as well as state-of-the-art design and construction methods. Trenchless technology is a <br />specialty of our pipeline services group and our engineers are experienced in trenchless design and the <br />latest construction techniques available in the industry. The Michael Baker team also includes engineers <br />that are familiar with pumping stations and storage reservoirs of all types in addition to pipeline design and <br />replacement. <br />Summary of Michael Baker Services <br />Below is a table summarizing the in-house professional services that Michael Baker offers in the Water <br />Resources practice along with additional related specialized areas of design: <br />• Water / Wastewater <br />Planning & Feasibility <br />Studies <br />• Preliminary & Final Design <br />• Hydraulic Modeling <br />• Pipeline Design <br />• Condition Assessment <br />• Municipal Wells <br />• Pumping / Lift Stations <br />• Reservoirs <br />• Pressure Regulating <br />Stations <br />• Transient Analysis <br />• Computer Modeling <br />• Wellhead Treatment <br />• Membrane Treatment <br />Technologies <br />Michael Baker Team <br />• Flow Control Turnouts & <br />Metering Facilities Gravity <br />Sewers <br />• Sewage Lift Stations <br />• Topo Survey / Mapping <br />• Legal Descriptions/Exhibits <br />• Civil Engineering <br />• Structural Engineering <br />• Architecture <br />• Mechanical / Heating <br />Ventilation & Air <br />Conditioning (HVAC) <br />• GIS/Atlas Mapping <br />• Environmental <br />Documentation - California <br />Environmental Quality Act <br />(CEQA)/National <br />Environmental Policy Act <br />(NEPA) <br />• Landscape <br />• Electrical, Instrumentation & <br />Controls <br />• Supervisory Control & Data <br />Acquisition (SCADA) <br />Improvements <br />• Regulatory / Permitting <br />• Constructability Reviews <br />• Construction Support <br />• Plan Check Services <br />• Construction Management <br />and Inspection <br />• Startup / Commissioning <br />• Record Drawing <br />Preparation <br />• Reclamation Systems <br />• Wastewater Treatment & <br />Disposal <br />Key Staff Qualifications <br />Our Water Resources Department consists of highly experienced professionals dedicated to serving the <br />needs of our clients. In addition, Michael Baker has in-house expertise in electrical engineering, structural <br />engineering, environmental analysis, survey, permitting, and construction management to assist in project <br />delivery. Our Key Staff biographies that illustrate experience and qualifications are included in the following <br />pages. Resumes of our key staff and a table of qualifications from our support team are included in the <br />Appendix. Resumes include associates in charge for specific tasks when the project manager/principal is <br />not available. Our Team's Organization Chart and Availability is depicted on the following pages. <br />Proposal I Page 4 On -Call Water Resources RFP No. 19-100 <br />INTERNATIONAL <br />