My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER INTERNATIONAL, INC-A-2020-075-02
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER INTERNATIONAL, INC-A-2020-075-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2021 5:20:45 PM
Creation date
5/6/2020 4:03:34 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER INTERNATIONAL, INC
Contract #
A-2020-075-02
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
8/30/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A REQUEST FOR PROPOSAL <br />6 On -Call Water Resources Engineering Services <br />(RFP NO.19-100) <br />f t <br />• Cathodic Protection: The Michael Baker team will monitor and evaluate existing impressed and <br />galvanic cathodic protection systems present on pipelines or reservoirs for effectiveness, remaining <br />useful life, and operation. Upgrades will be designed in accordance with current industry standards. <br />• Quality Control Inspection: We will provide inspection of the contractor's coating and paint <br />operations to verify the work is being accomplished in accordance with the specifications and plans. <br />Other <br />Any and all other tasks as described in the request for proposal and not specifically discussed above, will <br />be performed by Michael Baker's Santa Ana staff, or through one of our trusted subconsultants as shown <br />on the proposed organization chart. We are confident that our team has extensive experience in providing <br />described services and will be an asset to the City for their projects. <br />2. Pipeline Design <br />• Survey and Data Collection: Based on our previous experience with the City, we understand that <br />the City may be providing survey for their projects. However, if needed, Michael Baker can provide <br />complete survey and mapping services. The horizontal and vertical control is the backbone of <br />any successful pipeline project. The placement of control point locations is carefully evaluated <br />to refine control point locations to better serve a project and make the working conditions safe for <br />the field staff. <br />• Safety and Traffic Control: We will consider construction safety concerns during the design to <br />assure that developed plans can be safely constructed and ensure a safe parkway environment at <br />all times. For pipeline construction on major arterial streets that impose significant safety issues, <br />we highly recommend developing traffic control plans. As our continued teaming partner, we have <br />included Traffic Control Engineering (Mr. David Kuan, PE) in our team. He is intimately familiar with <br />the City's traffic condition and its requirements and will provide temporary traffic control plans for <br />our projects. <br />• Public Impact: It is incumbent upon the design team to work with the City to minimize public <br />impacts in terms of the proposed improvements, the schedule, the phasing and anticipated traffic <br />detour plans. <br />• Pipe Installation: The Michael Baker team will make sure that all pipes are being designed with <br />access points, proper gaskets, fitting restraints or flange systems, and that the design follows the <br />City's general requirements and approved list of materials and vendors. We have been working <br />with the City in the past and are familiar with the City's specific standards and requirements <br />and will implement them into our design. <br />• Preliminary Design: The Michael Baker team will establish design criteria, verify pipeline <br />alignments and sizes, conduct field walks to determine potential design and construction conflicts <br />and verify field topography data. Tasks will include identifying existing improvements, utility conflicts <br />and construction constraints; calculate restrain lengths; identify restrained joints and/or thrust block; <br />prepare plan view and/or cross -sectional view (if necessary) showing alternative construction <br />where water main is not in compliance with California Division of Drinking Water requirements; and <br />notify utility owners to coordinate the resolution of identified conflicts. <br />• Final Design: The Michael Baker team will prepare a construction package consisting of plans and <br />specifications for the construction of pipeline projects. <br />3. Electrical, Instrumentation, & Control <br />Michael Baker provides a wide range of electrical engineering services to meet specific project <br />requirements. Michael Baker provides in-house electrical services in support of our larger multi -disciplined <br />engineering efforts, and offers our specialty electrical engineering services which include power demand, <br />short circuit, and coordination studies and comprehensive design to individual clients. In today's electrical <br />utility market, an efficient, cost-effective power distribution system has become essential. Our <br />11.112F.T1--�-k1.':a7 Proposal I Page 15 On -Call Water Resources RFP No. 19-100 <br />INTERNATIONAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.