Laserfiche WebLink
REQUEST FOR PROPOSAL <br />On -Call Water Resources Engineering Services <br />unxntataal <br />Relevant Project Experience <br />Praised "Mr.I""'Art ddhdt Na or aria Phone Chargedes <br />Date of Com betlon cescd lion <br />reservarvell be partially buried and located at the site mexisting Chino Hills Reservoir No.I wtNm the Village Oaks <br />community. The project included an analysis of steel vs. concrete tank types, development of demolition plans rat <br />Me existing reservair, and design of the new reservoir. Michael Baker Is currently updating CEOA documentation <br />antl providing final tlesign services. <br />Tumout Station Mater Repleemmout Project I Mesa Water Disfind <br />1 <br />McM1ael Baker provitle0 designengineering and consumption phase support services for Me replace <br />ment of Row <br />meters antl piping at three water Import stations on the OC-44 transmission main, designated as Tumour Nos. TO- <br />21 TO-4, and TO . Work under this project included rebabililaling Me existing Cla-Val control valves in each vault <br />replacing all piping and installing new electromagnetic flaw meters, pressure gauges, pressure Vansmiber, , <br />solenoids and Integration of telemetry, instrumentation and controls with MWD Supervisory Control and Dale <br />Acquisition (SCADA) system. Michael Baker worked Win Mesa Water engineering and operations staff and Mae. <br />Waters SCADA system integrator to develop operational (flow and pressure) set points, programming protocols <br />for each tadliry, and provide the electrical design necessary to integrate the Improvements with Mesa Waters <br />SCADA systemManhattan Beach Pump Stamon I Los Angeles County Pubfic Wource <br />Michael Baker is providing engineering services to prepare a hydrology and hydraulic analysis for the Manhattan <br />Beach Pump Station Watershed within Me City of Manhattan Beach. The approximately 462-acre exalershed <br />consists of two (2) pump stations Nat drain the vraleamed The study included watershed delineation and <br />esdmagng Me discharges using LA County methodology For Me l 25 antl 10-yeaf storm events. The batch basin <br />inlet curves were marshalled using standard inlel equations Me ID 2D hydraulic muting was performed using <br />%PSWMM. Michael Baker identified deficiencies within the City and County storm drain systems in the Manhattan <br />Beach Pump Station Watershed. 7 <br />Bakes. Resembled Project I City .1 Newport Bpa,h <br />I Completion Dale Ol <br />E <br />Michael Baker is providing engineering and environmental services for Nis project to connect an existing stand <br />drain outlet to a newwater quality facility before discharging to the Upper Newport Bay. <br />The project involves the consumption ofapproximately 500linear feet of storm drain, a damp inlet, impact structure <br />and basin outlet structure. The prejecl is grant funded and will help the City meet TMDL requirements for sediment <br />in Lipper Needed Bay. The project involved extensive coordination With Me city, residential land owners, the <br />Newport Bay conservancy, and the County of Orange. The regulatory portion of Me project required CEOA, <br />Caledonia Coastal Commission, Re moral Search CS. Arm Ca sot En neers, and Fish and Game permits <br />Landama rk Sewer Lift Station I Five Point JEM 1131=11 <br />Completion Date Ongoing -Est 1212019 <br />Michael Baker is performing preliminary and anal assign services fora new lie station to convey sewage hose <br />approximatelyfi000 units to the Valencia Water Reclamation Plant. The project consists of boiling a new ex" in - <br />place concrele dry and coat pitIll station with a capacity d 2,650 gallons per minute a valve and bypass vault, <br />emergency storage tanks, odor control electrical gear, control systems a standby generator, and new, 17,400- <br />food dual -force mains. For this project, Michael Bakeris providing hydraulic, civil, eleclriwl, swctuml, mechanical, <br />and WAD design. <br />:r 10C.Ig <br />AL <br />Project Name I Client I Co mtacs Name and Phone I - - be egif ei <br />Dare of Correlation I Natim lion <br />The Orange County Flootl Control Master Plan (OCFCMP) incorporated funding CIS line worn from County <br />Regional Channel Database (3,000 independent line segments) and Me existing county Deficiency Study and <br />developed a GIS Weblool for rating and ranking regional flood control projects within Orange County, California. <br />The pmjecls included both deficiency projects (project Nat did not meet County design criteria) and projects that <br />eth sucim w <br />ecapacity but required maintenance. The end product was het ebtools, one for viewing the rating <br />andranking data and one for editing the data. This Database contains information an channel sizes and deficiencies <br />Nroughout the County including areas within the City of Santa Are <br />13s <br />Michael Bakerprovided storm drain analysis for the widening of Wamer Avenue from Main utu etN Grand Avenue. <br />The goal of Me study was analyzing drum brain aftematives and determine the appropriate pipe sizing. In Me <br />existing condition, the area receives too much runoff Nat over tops the current storm drain system. The dvain source <br />of the runoff is Rouselle Street. The proposed improvements include the Warner Avenue reach betvreen Rental <br />street and Standard Avenue will be upsized and a new parallel pipe will be built tram poste lM to Main Street. <br />References <br />• <br />Mesa Water Listtid <br />Phil Lou., PE <br />CC44 Pipeline RahaWliftal <br />Assistant General Manager <br />Project description includetl in table <br />P. 949-207-5449 <br />above <br />E. phillrtmesawatecarg <br />Santa Citrga Valley Water Agency <br />Rio Vista Valve#2(RV-2) <br />Jason Vim, PE, Principal Engineer <br />P. 581-51112➢y <br />Project description included in table <br />Vault Modifications <br />E. )ylrn®uvwa.or9 <br />above <br />Orange County Public Works <br />Orange County Flootl Goa l <br />Penny Lew, PE, CFM <br />Project description Included in table <br />Master Plan (OCFCM a <br />Senior Civil Engineer <br />above <br />P 714£41-3990 <br />E. Penny lawaggypErsopgoo.corn <br />Le®gend <br />Oa <br />Water Storrs Reservoir Pump <br />wafer Station <br />U ® M © El <br />Structures Studies Seach Pipeline Wells Electrical Recycled <br />I' Proposal I Page 19 OnCallWater Resources RFP No. Ill <br />