My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER INTERNATIONAL, INC-A-2020-075-02
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER INTERNATIONAL, INC-A-2020-075-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2021 5:20:45 PM
Creation date
5/6/2020 4:03:34 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER INTERNATIONAL, INC
Contract #
A-2020-075-02
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
8/30/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR PROPOSAL <br />p On -Call Water Resources Engineering Services <br />(RFP N0.19-100) <br />Dan Smith, PE <br />Technical Peviaa=i Manage <br />Background <br />Mr. Smith has over 38 years of diverse engineering experience in the <br />water/wastewater industry encompassing project management, <br />planning and design, construction management, office and design team <br />management, and business development. His experience spans project <br />management and design experience covering recycled water, water and <br />wastewater infrastructure includes feasibility and planning studies, and <br />design/construction plans for wells, transmission and distribution <br />pipelines, sewer collection systems, pump stations, reservoirs, pressure <br />reducing and flow control facilities, small water/wastewater treatment <br />process systems, and sewage lift stations <br />YEARS OF EXPERIENCE: <br />38 <br />EDUCATION: <br />BS, Civil Engineering, <br />University of Wisconsin <br />LICENSES/CERTIFICATIONS: <br />Professional Engineer, <br />California, 1984, 37682 <br />Relevant Experience <br />Western Regional Trunk Sewer Rehabilitation, Orange County, <br />California. Orange County Sanitation District. Technical Advisor. <br />Responsible as the QA/QC reviewer for final design phase and as the technical advisor for assisting in the <br />preparation of predesign memoranda for alternative rehabilitation methods and construction phase <br />environmental issues. Michael Baker is providing engineering design services and is the Engineer of <br />Record for the rehabilitation of the Orange -Western Subtrunk Sewer. The project, located in the cities of <br />Anaheim, Buena Park and Cypress, includes: CIPP rehabilitation of 13,500 LF of the pipeline; replacement <br />of approximately 400 LF of 21-inch VCP; the replacement of 32 manholes with new 72-inch manholes; and <br />rehabilitation of seven manholes using a cured -in -place liner. Final design is underway, and construction <br />is scheduled to start in late 2019. <br />New River Phase I Improvement Services, Calexico, California. California State Water Resources <br />Control Board, Project Manager. Michael Baker provided all project management; civil, water resources <br />and mechanical design; environmental compliance; regulatory permitting; planning; land surveying and <br />mapping; natural resources/ habitat planning; and other related services to address point and nonpoint <br />sources of pollution for the New River. Innovative computational fluid dynamics and 3D modeling was <br />performed to evaluate the functionality and potential adverse impacts of a trash screen and diversion <br />structure designs. Extensive visual and 3D modeling was critical for stakeholder feedback during public <br />forum meetings. <br />Salton Sea Communities Water Main Replacement, Imperial County, California. Coachella Valley <br />Water District. Project Manager. Responsible for preparing plans, specifications and cost estimates for the <br />Salton Sea Communities Water Main Replacement Project, Phase 1. Michael Baker is supporting the <br />replacement of four critical water main crossings under Highway 86. The new pipeline crossing will be <br />installed using the jack and bore method and will tie into the existing pipelines on either side of Highway <br />86. Work also involves potholing, topographic survey/base mapping, geotechnical field investigation, <br />Caltrans Encroachment Permit approval, and construction support services. <br />Vista Village Drive Trunk Sewer Improvements Design/Build, Vista, California. TC Construction. <br />QA/QC Engineer. Responsible as the technical advisor for assisting with alignment and trenchless issues. <br />Performed QA/QC engineer duties for construction plans and specifications. Michael Baker was <br />responsible for the design and construction of approximately 2,500 linear feet of new 36-inch trunk sewer, <br />including traffic control, Caltrans Encroachment Permit for microtunneling under 1-78, environmental <br />permitting, and sewer bypass plans. The innovative approach allows flow interception and abandonment <br />of two pipelines within Caltrans right-of-way that were identified as high priority capacity upgrades. The <br />Proposal I Page R-7 On -Call Water Resources RFP No. 19-100 <br />I N TE N N AT 10 N AL <br />
The URL can be used to link to this page
Your browser does not support the video tag.