L
<br />REQUEST FOR PROPOSAL
<br />On -Call Water Resources Engineering Sery
<br />(RFP NO.19-100) _
<br />Ernesto Vicente,
<br />PhD, PE, GE
<br />Geotechnical
<br />• PhD, Civil/Geotechnical Engineering,
<br />Rensselaer Polytechnic Institute, Troy,
<br />New York, 1983
<br />• MS Civil/Geotechnical Engineering,
<br />Rensselaer Polytechnic Institute, Troy,
<br />New York, 1978
<br />• Hydroelectric Developments Diploma,
<br />Universidad Nacional, Buenos Aires,
<br />Argentina, 1973
<br />• Geotechnical Engineer, California No.
<br />G2302
<br />• Civil Engineer, California No. C46895
<br />Boudreau Pipeline Corporation
<br />Jim Mihld
<br />Potholing/Utility
<br />Location
<br />• Engineers (NACE) International, 2003
<br />• OSHA's 19CFR 1910.146 permit
<br />required confined space compliance
<br />Traffic Control Engineering
<br />David Kuan, PE
<br />Traffic
<br />MS Transportation Engineering,
<br />University of California at Berkeley
<br />BS, Civil Engineering, University of
<br />California at Irvine
<br />Professional Traffic Engineer JR 1429)
<br />Professional Civil Engineer (C 57387),
<br />CA
<br />Thomas Harder and Company
<br />Thomas E. Harder,
<br />PG, CHG
<br />Hydrogeology
<br />Jim Van de Water,
<br />PG, CHG
<br />Hydrogeology
<br />• MS, Geology with Honors,
<br />Hydrogeology, California State
<br />University — Los Angeles, California
<br />• BS, Geology. California State
<br />Polytechnic University - Pomona
<br />• California Professional Geologist (No.
<br />6512; May 1996)
<br />• Certified California Hydrogeologist (No.
<br />588; June 1998)
<br />• MS, Hydrology and Water Resources,
<br />University of Arizona, 1989
<br />• BS, Geology. State University of New
<br />York at Stony Brook, 1986
<br />• California Professional Geologist (No.
<br />6538; June 1996)
<br />• Certified California Hydrogeologist (No.
<br />508; June 1995)
<br />• Casa Loma Siphon No. 1 Fault
<br />Crossing Project, Casa Loma,
<br />California
<br />• Moulton Niguel Water District Plant
<br />3A - Geotechnical Distress
<br />Investigation for Settlement
<br />Mitigation, Mission Viejo, California
<br />• PCCP Rehabilitation Project
<br />(Sepulveda Feeder), California
<br />• New Ocean Outfall and Tunnel,
<br />Feasibility Studies, County of Los
<br />Angeles, California-
<br />• City of Fullerton Water Improvement
<br />(Loma Alta).
<br />• Hawthorne Boulevard and
<br />Residential Area Water Main
<br />Replacement, (1-153).
<br />• Zone 3-4 Booster Pump Station,
<br />Irvine Ranch Water District (IRWD).
<br />• Macarthur Boulevard Street Rehab.,
<br />Bristol Street to Flower Street, Santa
<br />Ana, California
<br />• Katella Avenue Widening Project at
<br />State College Boulevard, Anaheim,
<br />California
<br />• Anaheim Hills Road, Sewer Main
<br />Construction, Anaheim, California
<br />• Chino Desalter Well Field Design and
<br />Construction
<br />• Mojave Water Agency's Regional
<br />Recharge and Recovery Project
<br />• Construction and Testing of
<br />Municipal Production Wells,
<br />California, Arizona and Mexico
<br />• Well Rehabilitation Projects,
<br />Southern California
<br />• Groundwater Flow Model of Kern Fan
<br />Area, Bakersfield, California
<br />• Groundwater Flow Model of Tule
<br />Basin, Tulare County, CA
<br />• Groundwater Recharge Analysis,
<br />Orange County, California
<br />• Groundwater Flow Model, Beaumont
<br />Basin, Riverside County, California
<br />La a;z=m Proposal I Page R-28 On -Call Water Resources RFP No. 19-100
<br />INTERNATIONAL
<br />
|